Laserfiche WebLink
<br />AL <br /> <br />Note: Task 1: Funds identified for topography mapping to be directed to <br />Bureau of Reclamation, Survey Section of the Field <br />Engineering Branch, Grand Junction Project's Office. <br /> <br />Description of work: Conduct topography/surveying of immediate site and <br />area adjacent to site--prepare a contour map with <br />ground control poin~s for future reference <br /> <br />Deliverables (due date): 6/95; <br />Task 1: Topographic Mapping $ <br />Task Total $ <br /> <br /> <br />~""Y>"I <br />\~j.9.,<o\a~,,\ <br />C:r~1'\OT"Q\61~5 <br />SOW.' <br /> <br />Task 2: Conceptual Plan (Funds to be directed to USFWS, CRFP, Grand <br />Junction) <br /> <br />Description of work: write conceptual plan; participation in general <br />oversight of site development <br /> <br />Deliverables (due date): Task 2: 8/95 <br /> <br />1. Labor <br />Conceptual Plan (Task 2) <br /> <br />2. Other (Air Photo Duplication) <br /> <br />Task Total <br /> <br />$ 4,500 <br />$ 2,500 <br />$ 7,000 <br /> <br /> <br />Note: Task 4: Funds identified for NEPA compliance and permits to be <br />directed to the Environmental Assesment Branch, Grand <br />Junction Project's Office. <br /> <br />Description of work: conduct NEPA Compliance <br /> <br />Deliverables (due date): 8/95 <br /> <br />Task 4: NEPA Compliance: NEPA Compliance funding is itemized in a <br />SOW <br /> <br />FY-95 Tasks Total <br /> <br />/ <br />$ ~500 <br /> <br />"700Cl <br />) <br />~'" ~'^..s... T. <br />SoW <br />0() 1. ~\- S"'...."'. <br />>>'" ~ ' <br /> <br />FY 96 Work <br /> <br />Budget estimate (by tasks) <br /> <br />Task 3: Biological Inventory/Hydrological Monitoring; Site Design and <br />Planning for Phase II $ 15,000 <br /> <br />FY-96 Task Total $ 15,000 <br /> <br />5 <br />