My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02694
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02694
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:46:27 PM
Creation date
10/11/2006 11:18:00 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.10.C.4
Description
UCRBRIP Flooded Bottom Lands
Basin
Colorado Mainstem
Date
1/1/1995
Author
UCRBRIP
Title
Floodplain Habitat Restoration - 1995 Work Plan
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />AL <br /> <br />Note: Task 1: Funds identified for topography mapping to be directed to <br />Bureau of Reclamation, Survey Section of the Field <br />Engineering Branch, Grand Junction Project's Office. <br /> <br />Description of work: Conduct topography/surveying of immediate site and <br />area adjacent to site--prepare a contour map with <br />ground control poin~s for future reference <br /> <br />Deliverables (due date): 6/95; <br />Task 1: Topographic Mapping $ <br />Task Total $ <br /> <br /> <br />~""Y>"I <br />\~j.9.,<o\a~,,\ <br />C:r~1'\OT"Q\61~5 <br />SOW.' <br /> <br />Task 2: Conceptual Plan (Funds to be directed to USFWS, CRFP, Grand <br />Junction) <br /> <br />Description of work: write conceptual plan; participation in general <br />oversight of site development <br /> <br />Deliverables (due date): Task 2: 8/95 <br /> <br />1. Labor <br />Conceptual Plan (Task 2) <br /> <br />2. Other (Air Photo Duplication) <br /> <br />Task Total <br /> <br />$ 4,500 <br />$ 2,500 <br />$ 7,000 <br /> <br /> <br />Note: Task 4: Funds identified for NEPA compliance and permits to be <br />directed to the Environmental Assesment Branch, Grand <br />Junction Project's Office. <br /> <br />Description of work: conduct NEPA Compliance <br /> <br />Deliverables (due date): 8/95 <br /> <br />Task 4: NEPA Compliance: NEPA Compliance funding is itemized in a <br />SOW <br /> <br />FY-95 Tasks Total <br /> <br />/ <br />$ ~500 <br /> <br />"700Cl <br />) <br />~'" ~'^..s... T. <br />SoW <br />0() 1. ~\- S"'...."'. <br />>>'" ~ ' <br /> <br />FY 96 Work <br /> <br />Budget estimate (by tasks) <br /> <br />Task 3: Biological Inventory/Hydrological Monitoring; Site Design and <br />Planning for Phase II $ 15,000 <br /> <br />FY-96 Task Total $ 15,000 <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.