My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02694
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02694
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:46:27 PM
Creation date
10/11/2006 11:18:00 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.10.C.4
Description
UCRBRIP Flooded Bottom Lands
Basin
Colorado Mainstem
Date
1/1/1995
Author
UCRBRIP
Title
Floodplain Habitat Restoration - 1995 Work Plan
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />AL <br /> <br />identified for pilot studies or restoration, a site specific document <br />or categorical exclusion will be developed. Cultural resources and <br />permitting will be conducted within the framework of this task. This <br />work will be conducted by the program's environmental compliance <br />coordinator with the Bureau of Reclamation Grand Junction Project's <br />Office. <br /> <br />5. Site DesiQn. EnQineerinQ. and Construction. The conceptual plan will <br />provide details on the specific action originally proposed for this <br />site. Additionally, the study design necessary to conduct the on-site <br />contaminant studies will then be considered and incorporated into the <br />site design to accommodate this work. The I-foot contour topography <br />map will assist engineers in designing any water and/or fish control <br />structures, excavation depth of the inlet and outlet channels, and <br />slope of the tertiary side channel necessary to reconnect the side <br />channel. It is perceived that this work will be accomplished by the <br />Bureau of Reclamation's Grand Junction Project's Office. FWS will <br />provide general study coordination during this phase. <br /> <br />VII. Task Description (FY-I995) <br />(see VI. Study Methods/Approach above for description) <br /> <br />1. Topographic Mapping. <br /> <br />2. Conceptual Plan. <br /> <br />3. Biological Inventory/Hydrological Monitoring. <br /> <br />4. NEPA Compliance. <br /> <br />5. Site Design, Engineering, and Construction. <br /> <br />VIII. Study Schedule (start/end by Task) <br />Task 1. 2/95~5/95 <br />Task 2. 4/95~8/95 <br />Task 3. 1997 <br />Task 4. 3/95~8/95 <br />Task 5. 1997 <br /> <br />IX. FY 95 Work <br />Budget estimate (by tasks) <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.