My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02645
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02645
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:37:55 PM
Creation date
10/11/2006 11:15:16 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
5700
Description
Flood Protection Section - Flood Control Projects
State
CO
Basin
Statewide
Date
7/1/1985
Author
BRW Inc - WRC Engine
Title
Feasibility Study for the Cherry Creek Basin Drainageway - for Cherry Creek Basin TAC and Parker-Jordan Metropolitan District
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />001022 <br /> <br />D. Alternative Plan Selection <br /> <br />After the alternatives presented in Section IV-C were reviewed by the TAC <br />and the property owners, the CONSULTANT then assembled the alternatives into <br />several plans for further consideration. The effects of each plan on the <br />sediment transport (and therefore maintenance requirements and offsite impacts) <br />were evaluated along with the relative capital costs. These plans were then <br />graphically illustrated and presented at a joint meeting of the TAC and the <br />property owners. A summary of the alternative plans is presented in Table-2. <br /> <br />Subsequent to the general presentat i on of the alternat i ve pl ans, i nd i vi- <br />dual meetings were held between the primary effected property owners to discuss <br />the plans further. Based upon the meetings, a selected plan was assembled, <br />which is illustrated in Figure-lO. A preliminary design was then prepared for <br />the selected alternative plan (see Chapter V). <br /> <br />-30- <br />
The URL can be used to link to this page
Your browser does not support the video tag.