My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02622
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02622
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:37:49 PM
Creation date
10/11/2006 11:14:09 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8141.400
Description
Fryingpan-Arkansas Project - Reports
State
CO
Basin
Arkansas
Water Division
5
Date
4/1/2003
Author
US DoI BoR
Title
Draft Environmental Assessment For the Pueblo West Pipeline and Pumping Station Project
Water Supply Pro - Doc Type
EIS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.... l\ ~ <br />'2''':/"' .. <br /> <br />Chapter 3: Environment and Environmental <br />Consequences <br /> <br />Chapter 3 describes hydrology, recreation, threatened and endangered wildlife and plants, cultural <br />resources, and noxious weeds within the project area. These are the resources that could be affected <br />by the Proposed Action. This description is followed by an analysis of the effects of the alternatives <br />(explained in Chapter 2). Effects of the No Action Alternative are presented first, followed by effects <br />of the Proposed Action. <br /> <br />Scoping determined that Pueblo Reservoir storage, Indian trust assets (legal interests in property and <br />lights held in trust by the U.S. for Indian tribes or individuals), environmental justice (adverse effects <br />to a particular social-economic group, including low-income or minority populations), wetlands, <br />floodplains, or migratory birds would not be affected by either of the alternatives in this EA. <br /> <br />Table 3.1 is a summary of the effects that are desclibed in more detail in the remainder of this chapter. <br /> <br />Table 3.1 Summary Matrix of Resource Impacts under the Current Situation, No Action <br />Alternative and the Construction Alternative. <br />Resource Current No Action Alternative Construction Alternative <br />Hydrology <br />Arkansas River 'State of Colorado requests 'State of Colorado requests 'State of Colorado requests <br />Flows Above target flows for Arkansas; target flows for Arkansas; target flows for Arkansas; <br />Pueblo Reservoir Reclamation responds by Reclamation responds by Reclamation responds by <br /> releasing water from Twin releasing water from Twin releasing water from Twin <br /> Lakes to meet target flows Lakes to meet target flows Lakes to meet target flows <br /> 'Pueblo West will reach max. 'Pueblo West will reach build <br /> capacity in 2007; very minor out in 2019; minor increase in <br /> increase in amount of water amount of water Pueblo West <br /> Pueblo West conveys down conveys down Arkansas River; <br /> Arkansas River; no change in no change in the net flows of <br /> the net flows .of Arkansas Arkansas--River due to <br /> River due to adjustment of adjustment of Reclamation <br /> Reclamation releases to meet releases to meet State's <br /> State's requested target flows requested target flows <br /> -Adjustments in Project water . -Adjustments in Project water <br /> releases will not result in any releases will not result in any <br /> water "savings", only a re- water "savings", only a re- <br /> timing of releases timing of releases <br />West Pueblo Ditch -Existing diversion structure -No construction activities -Potential to cause impacts to <br />Diversions serves the Rock Canyon Swim would occur. so no impacts to West Pueblo Ditch Diversions <br /> Beach West Pueblo Ditch diversions due to construction activities <br /> would occur and modification of the <br /> diversion structure <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.