Laserfiche WebLink
<br />'-"'.:-:;"','/ <br /> <br />1.5) <br />If)/ <br />/!I, , <br />'Ii 1:.:'/0 <br /> <br />f)~c <br /> <br />C:~ <br /> <br />'. ) <br />('~.I <br /> <br />co <br />00 <br />C,Q <br /> <br />PHASE I FEASIBILITY STUDY FOR <br />UPPER GUNNISON-UNCOMPAHGRE BASIN <br /> <br />TASK MEMORANDUM NO. 1 <br /> <br />Submitted to: <br /> <br />Colorado Water Resources and Power Development Authority <br />1580 Logan Street, Suite ~20 <br />Denver, Colorado 80203 <br /> <br />Prepared by: <br /> <br />HDR Infrastructure, Inc. <br />1100 Capitol Life Center <br />Denver, Colorado 80203 <br /> <br />In association with: <br /> <br />WBLA, Inc. <br />Woodward Clyde Consultants <br />U.S, Bureau of Reclamation <br />C.U. Center for Economic Analysis <br /> <br />November 1987 <br /> <br />J" <br />~ <br /> <br />.<J ~ <br />ol.f)81 <br />