Laserfiche WebLink
<br />o <br />,-") <br />,.." <br />" Ul <br />CT.l <br />CT.l <br /> <br /> <br />-2- <br /> <br /> <br />taken i 0 Rooky Hountain National !'ark. <br /> <br />(9) <br />all stru <br />natural s <br /> <br />(10) <br />Thanpson <br />water. <br /> <br />(11) <br />all avail <br />River in <br /> <br />(12) <br />to divert <br />known as C <br /> <br />(l~) <br />to store <br />reservoir <br />mile oanal <br /> <br />(14) <br />Colorado. , <br />plant to a <br />as Horseto <br /> <br /> <br />The waste rook frcm the tunnel is to be terraced and landscaped and <br />ures connect,ed with the tunnel will be oonstruoted to blend into their <br />rroundi.ngs . <br /> <br />A power plant known as power plant no. 1 oonstructed along the Big <br />iver just below the village of Estell Park utiliJ!:ing the western slope <br /> <br />Four additional power plants down the Big Thompson Canyon to utilize <br />ble fall and also all water available for power in the Big Thompson <br />ddition to the western slope water diverted. <br /> <br />A diversion dam on Big <br />he water by means of a <br />rter LElke. <br /> <br />Thompson River about 12 miles wellt of Loveland <br />canal 9 milell in length to a storage reservoir <br /> <br />Carter Lake Reservoir located 8 miles northv.est of Berthoud, Colo., <br />tel" brought over during winter months. Water is released !'ran this <br />hrollgh a 4-mile canal into the Big Thompson River and through a 9- <br />into the St. Vrain River for irrigation purposes. <br /> <br />siphon aoross the Big Thompson Rlver, 9 miles west of Loveland. <br />nd a canal 10 miles in length to oonvey water from the f'ourth power <br />torage reservoir, located about 5 miles west of Fort COllins, known <br />h Reservoir. <br /> <br />(15) oanal from Horsetooth Reservoir to the Caohe La Foudre River and <br />extended no th to a pumping plant whioh lifts water high enough to serve the <br />North Poudr Canal. <br /> <br />(16) <br />Arkins Rese <br />just below <br />mands for p <br />Thomps on Ri <br />gation in t <br /> <br />(17) <br />Servioe Co. <br />with the tr <br />plants. The <br />run east. an <br />Park, orossi <br /> <br />storage reservoir near the mouth of Buokhorn Creek to be known as <br />oil". supplied from a oanal diverting from the Big Thompson River <br />he last power plant. It is to be used to aid in balanoing the de- <br />l" and irrigation, also storing exoess water available in the Big <br />r. l'later will 'be released from the reservoir for supplemental irri- <br />e South Platte area. <br /> <br /> <br />ansmission lines conneoting tl~ Valmont steam plant of the Publio <br />dth all the hydroeleotric plants oontemplated, also oonneoting <br />smountain tunnel portals and the Granby and North Poudre pumping <br />line oonneoting power plant no. land Granby pumping plant will <br />south of the outside boundaries of the Rooky Mountain National <br />g the Continental Divide at Buohanan Pass. <br /> <br /> <br />In orde to oarry out the oonstruction, operation, and maintenanoe of the <br />project as 0 tUned above, it win be neoessary to oomply with the following <br />requirements as agreed to by representatives of the eastern and western slopes <br />in Colorado d here made as a part of this report. <br /> <br />I <br />.1 <br /> <br />, <br />i <br />1 <br />i <br />