Laserfiche WebLink
<br />, <br />l <br />I <br /> <br /> <':,) <br /> . ~.'') <br /> !'.... <br /> c.n <br />. 00 <br /> ~ <br /> <br />..eo.. <br /> <br />" <br /> <br />NORTH roRK DIVERSION !),AM <br /> <br />The d proper is a concrete gravity overflow' spillway se(ltion. 90 feet <br />,long. with crest elevation at 8.370. This spillway is designed for muim1illl <br />disoharge f 1.!300 cubic feet per second. On each side of the overflow sejJtion <br />is a concr e gravity section oontaining three automatio siphon spinways 'on <br />each side. The total spillway capacity is 9.400 cubic feet per second. <br /> <br /> <br />al estimated cost is $483.928. <br /> <br />.., <br /> <br />GRANaY PUMPING PLAm <br /> <br />1I.s s ed before, the water surt'a.oe elevation of Grailby Reservoir is B,e75 <br />and the wat r surfaoe of Shadow Mountain and Grand Lakes is 8,369. In orcl,er <br />to get the tel' stored in Granby Reservoir into ShadOW Mountain Lake and avail- <br />able for d ivery through the Continental Divide tunnel, a Pumpill/!; plant ill <br />,looated on he north shore of Granby Reservoir about one-palf mile above 'the, <br />junotion 0 the South Fork with the Color!l-do. A granite spur juts out into the <br />reservoirs te at that point wing it ideal for the intake tunnels and a shaft <br />~~~~ " <br /> <br />The pr posed pumping plant will contain three motor-driven vertioal-s~ft <br />pumping uni s having a total capaoity of 900 cubic feet per seoond with ruil <br />reservoir a d 550 cubic second-feeta't low water.. At normal water surface the <br />capt.oity wi 1 be 870 oubio feet, per second.. <br /> <br />p will be driven by a 6.500"horsepower synchronous motor., <br /> <br />P~r 11 be delivered to the plant from a 69.000-volt trallllll1il!sion line <br />extending om power plant no. 1 just below Estes Park, around the Rocll:y ;.:, <br />Mountain Ne. ional Park. and orossing the Continental Divide at Buchanan fas,s <br />about 5 mil s south of the park boundary. . <br /> <br /> <br />.' The wa er !'rom the pumps empties into a canal of 900 cubic seoonli-feet <br />oapaoity an runs by gl"avity into Shadow Mountain Lake. ,It is planned to <br />operate thi caml all winter when temperatures get as 'low as 40. below zero. <br />The latent eat in the water and the friction heat absor)led fram the pumps will <br />prevent thi water !'rom freezing and will keep quite an area open after the water <br />reach6ll Sha ow Mountain Lake. " <br /> <br />, <br /> <br />The t al estimated cost of the pumping plant is $11250,000 <br /> <br /> <br />The t al estimated cost of the pump canal is $417,553. <br /> <br /> <br />com INENTAL ,DIVIDE TUNNEL <br /> <br />j <br />p <br />i <br />J <br />, <br />'. <br />'; <br />, , <br /> , <br />" <br />, <br />, <br />., ,:} <br />:! ., <br />'t -1 <br />, <br />.'" <br />I <br /> <br />The we <br />conetructed <br />ohannel a <br />vation at 8 <br />Grand Lake <br />the water t <br /> <br />tunnel portal is conneoted with Grand Lake by means of a chalUl61 <br />67 -5 feet in width and 15 feet in depth. At the lake end of this <br />, " <br />nent ooncrete barrier or weir will be plaoed with a crest ele- <br />68 which would be the minimum elevation to wl1ioh the water in ' <br />ould be drawn. Sinoe the barrier is so construoted that it requir~s <br />be 1 foot in depth over it to supply the normal capacity of the <br /> <br />i-.--,- <br /> <br />; ! <br /> <br />.- - ,- ~,..." "; ~ ", > ~;. <br /> <br />","'_"-,, ; ;;1- _~_,;.' J..<" l <br /> <br />.: j,- ;'~'_ ,ii,;;~;;~i~"; - . <br />