My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02536
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02536
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:37:24 PM
Creation date
10/11/2006 11:11:52 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.05.R
Description
Hoover Dam/Lake Mead/Boulder Canyon Project
Basin
Colorado Mainstem
Date
10/31/1938
Author
Roberts A. B.
Title
Report of Competitive Value of Falling Water for Primary Energy at Boulder Dam in Competition with Steam Power at the Load Center
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />tC <br />~ <br />C'~ <br />e-.l <br /> <br />.c <br /> <br />. <br /> <br />. <br /> <br />---~,,; ~~>~; <br /> <br />-, ,~,_~_, ,_ _""'f'-,<:.~-- <br />- '~~-~r_- <br /> <br />~ -~_.~.,,- <br /> <br />-t: ~ '::;'"'-;-"~-~---J~;-~JJ:\:r~'.{T-;:.-:'::~~"'-:!.'~~~~j:~!'~-'~ <br />'"),:. -;~::.-~-- ','- <br /> <br />'~',~,",-": <br /> <br />17. <br /> <br />of the indivi!!,ual lino but really mE:ans the capacity of a <br /> <br />three-circuit system is 390,000 kw. delivered instead of <br /> <br />240,000 lrw. Since the third circuit, in the case of the <br /> <br />Bureau, is for the transmission of secondary energy, which <br /> <br />must bo backcd bV an auxiliary st,;am 1l1ant during periods <br /> <br /> <br />of low water, it is obvious that considerable additional <br /> <br />steam plant capacity will be r6quiro~ bv tho addition of <br />tho third circuit. <br /> <br />For tho transmission of greater quantities of power <br /> <br />from Boulder Power Plant to Los Angeles, as assumed by N~. <br /> <br />Sands in his report, an additional group of lines consist- <br /> <br />ing of two or thrl'c circuits, oporatinl': in parallel, will <br /> <br />be required. The operation of three circuits in parallel <br />imuosos a limit duty on all of the present switching and <br />station apparatus, which apparatus is the largest of its <br />kind ever built. Additional lines, oporated in parallel <br />with tho present three, would irr,ose duties on tho present <br />enuipment far in excess of thoir rating and require more <br />than a proportional increas8 in tho nQ~ber of circuit <br />breakers required at present. This procedure would there- <br />fore mean renlacing all of the nresont switchinf equipment <br />with that of a muoh greater ratinp than has over been de- <br />signed or constructod under the pro sent development of tho <br /> <br />art, and th,)reforc, would very materiall v increase the; in- <br /> <br />vestmont, possibly beyond economic limits and still not be <br /> <br />A. B. Roberts <br />
The URL can be used to link to this page
Your browser does not support the video tag.