My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02536
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02536
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:37:24 PM
Creation date
10/11/2006 11:11:52 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.05.R
Description
Hoover Dam/Lake Mead/Boulder Canyon Project
Basin
Colorado Mainstem
Date
10/31/1938
Author
Roberts A. B.
Title
Report of Competitive Value of Falling Water for Primary Energy at Boulder Dam in Competition with Steam Power at the Load Center
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />--:"-,~~' <br /> <br />" <br /> <br />N <br />1iII4 <br />N <br />C\J <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />~"~P7-' _,-,,~::,""""""F- <br /> <br />-- ~.""",~"-'~----' - " '-~""",\,,/~""'- <br /> <br />-~-~. <br />".- $.'~~''''''-; <br /> <br />-"~=,"""\'-"-:: <br /> <br />-''''''-~:'A~: -"~ <br /> <br />. -~i?~-"':~>-'-~-'!~~i5.~~:'T '_?-""7 ~~~~~~?_~) <br />--'-~ <br />-~ <br /> <br />~quiv~lent of one full-size unit. <br /> <br />I hD.ve used t:1::' actual costs of the two 0xioting <br /> <br />275,000 volt transmission circuits from Bould::.r Dnm to <br /> <br />Los AnC;01cs, includin?; t;,e switching station and rec::.i v- <br /> <br />ine; stn,tion ff'.cilitL.s as obtained from the cost rccords <br /> <br />of t..",,; 3ure,"u of Power end LL',:lt in estiml'.ting the invest- <br /> <br />mcmt cost of tl'[nsmission fJcilititJs, from which I have de- <br /> <br /> <br />v::.loped the fif~rcs of ~23,750,OOO for t~c existing two <br /> <br />circuits, and ~ll,9G5,000 per circuit for seven circuits. <br /> <br />In checking tho 0stimat::.s used by Joth Mr. Sands <br /> <br />[md the :ngintJ0rs of th;:; 3ur0".U of Power and Light for <br /> <br />steam plant invostment, I have used data from my files and <br /> <br />rC!1ched 11. conclusion that the unit price of ,1>87.50 per <br /> <br />kilowc,.tt of instalhd cc.pacity, including step-up station <br /> <br />P.t stet-.m plant, b r-.c 1<. trJ,nsmission to nearest receiving <br /> <br />st~,tion,--:nd step-down f;c,cilitics .~.t the receiving stntion, <br /> <br />is reasonably correct for the assumed oonditions. <br /> <br />Fixed Charges <br />In addition to m; review of tho value of f~ling <br /> <br />w".tcr "s devc:lopod by tht;' BUre[lU, I deri v0d the value based <br /> <br />upon fixed cThn.rges of 13.5% on ste~m plant nnd 10% on hydro <br /> <br />gencr.--:tion ~nd trnnsmisGion system investments, including <br />cpcrn,tion .--:nd m.J.intcn,,,-nc0 cxpens.:Js, ','Thich would be the ap- <br /> <br />proximrttc ch.--:rZos if priv,,-tuly o'imed. Corresponding <br /> <br />A. B. Roberts <br /> <br />13. <br /> <br />.~ <br />"'J <br />
The URL can be used to link to this page
Your browser does not support the video tag.