My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02529
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02529
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:37:23 PM
Creation date
10/11/2006 11:11:10 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.07.J
Description
Dominguez Reservoir Project
State
CO
Basin
Gunnison
Water Division
4
Date
1/1/1995
Title
Additional Documents Related to the Dominguez Water & Hydropower Project Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />r-. <br />0; <br />~ <br /> <br />,. <br />'- <br /> <br />DOMINGUEZ RESERVOIR PROJECT <br /> <br />USE OF INITIAL FUNDING - PRE-DESIGN PHASE PERMIT AND LICENSING <br /> <br />FUNDS AVAILABLE <br /> <br />USE OF INITIAL FUNDING PROCEEDS <br /> <br />1. <br />2. <br />3 . <br />4. <br />5. <br />6. <br />7. <br />8. <br />9. <br />10. <br />11. <br />12. <br />13. <br />14. <br />15. <br />16. <br />17. <br />18. <br />19. <br />20. <br />21. <br />22. <br /> <br />23. <br /> <br />24. <br /> <br />Issuance Fees <br />Dominguez Reservoir corp. operations Fund <br />Reimbursement of Previous Engineering Expense <br />Reimbursement of Prior Expenses <br />Office start-up Expenses-Equip/Furniture <br />Lower Basin & FERC Legal <br />General Legal <br />Administration, Clerical & Accounting <br />Water & Power Marketing <br />Special Consultants/project Coordination <br />Field surveying, Photogrammetric Mapping <br />Geotechnical Investigation & Test Drilling <br />Upgrade USBR Data & Identify Alternatives <br />Tabulation of Gunnison water Rights <br />Mass Diagram/Dam Break/Hydraulic Analyses <br />Land/Easement/options <br />Negotiations/Travel Expenses <br />Preparation Preliminary Design Documents <br />EIS Study/Group Negotiations <br />Final FERC Application & Hearings <br />Permit Fees <br />Preliminary Engineering of off River Power <br />and pipeline <br />contingency <br /> <br />TOTAL ESTIMATED PRE-DESIGN PERMIT AND <br />LICENSING PROJECT COST <br /> <br />$15,000,000 <br /> <br />750,000 <br />155,000 <br />265,000 <br />591,750 <br />175,000 <br />911,250 <br />500,000 <br />955,000 <br />1,066,250 <br />1,000,000 <br />58,250 <br />112,500 <br />112,500 <br />137,500 <br />100,000 <br />750,000 <br />460,000 <br />800,000 <br />1,556,250 <br />2,000,000 <br />600,000 <br /> <br />843,750 <br />1.100.000 <br /> <br />$15,000,000 <br /> <br />NOTE: 1. <br /> <br />THERE WILL BE ADDITIONAL CONTINGENCY FUNDS FROM MONTHLY <br />INTEREST INCOME FROM FUND BALANCES. <br /> <br />PRELIMINARY EXPENSES OF APPROXIMATELY $2,000,000 HAVE <br />BEEN COVERED BY A NOTE FROM WSWP THAT IS SUBORDINATED TO <br />THE ABOVE $15,000,000. <br /> <br />2. <br /> <br />NO.4 ABOVE IN THE AMOUNT OF $591,750 HAS BEEN <br />NEGOTIATED TO A PAYMENT OF $11,500 PER MONTH STARTING AT <br />CLOSING OF THE PROPOSED $15,000,000 EQUITY INVESTMENT. <br /> <br />3. <br />
The URL can be used to link to this page
Your browser does not support the video tag.