Laserfiche WebLink
<br />1),"'6 t <br />\:>_ ..t: <br /> <br />FRYINGP"N-^RK;d~SAS PROJECT LOCAL COfll1UNITY <br />EXPENDITURES AND LENGTH OF CONSTRUCTION PERIOD--ESTIMATED <br /> <br />[: <br />r <br /> <br />Loc'11 <br />EXl'"n"',itures <br />Annually <br />( uV8ri3.~8) <br /> <br />Tetal <br />Local <br />Expendi tUT'i..;S <br /> <br />, <br /> <br />Western Slope firea <br />Ruedi Darn and Reservoir, <br />Collection System b <br />high mountains (Glem;Qod <br />Springs, Carbondul", <br />Basalt, Aspen, Eagle, <br />Leadville) <br /> <br />9 y..::ars <br />(1964-1972) <br /> <br />$1,'100,000 <br /> <br />512,600,000 <br /> <br />Leadville-Buena Vista Area 9 years $1,500,000 <br />Turquoise Lake, Snowden (1964-1972) <br />Di vcrs ion Dam and C'J.I1<Jl, <br />Twin Lakes, Trans~ountain <br />Tunnel <br /> <br />$13,500,000 <br /> <br />Buena Vista-Se.lida ;,rea <br />Elbert, Oter'o, Wapaco, <br />Princeton, Pancho and <br />"alida Powerplants, <br />substations, and trans- <br />mission lines <br /> <br />11 years $2,000,000 <br />(1956-1976 ) <br /> <br />$22,000,000 <br /> <br />'!r:.~"ns2s Valley Area <br />,"ueblo Reservoir and <br />POl'8r'plant <br /> <br />13 years $1,500,000 <br />(1964-1976 ) <br /> <br />$19,500,000 <br /> <br />~olore.do Springs <br />municipal pipeline, <br />Canon City to <br />Colorado Springs <br /> <br />Pueblo to Lamar-- <br />municipal water <br />pipElin8 <br /> <br />$6,400,000 <br /> <br />567,600,000 <br /> <br />Total ~lapsed construction <br />time of pr0j~ct 13 tc 15 years* <br /> <br />Total estimated cost of project <br /> <br />$169,905,000 <br /> <br />*Construction sch2dule and 2rpropri~ti0ns m~y v3ry this schedule. <br /> <br />~, <br /> <br />-8- <br /> <br />~ <br />