My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02516
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02516
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:37:20 PM
Creation date
10/11/2006 11:10:23 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8141
Description
Fryingpan-Arkansas Project
State
CO
Basin
Arkansas
Water Division
2
Date
7/1/1965
Author
US DoI BoR
Title
Fryingpan-Arkansas Project Information Bulletin
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />O~6J <br /> <br />, <br /> <br />.' , <br /> <br />.> <br /> <br />: <br /> <br />Construction of Pueblo Dam 2nd Reservoir is scheduled to beein in.~967 <br />\-lith the award of the contract to rcl:..>cCltc the Denver a.ne Ric Grande West..:=rn <br />Railroad tracks ~r('und th~ new r~s8rv0ir'. C0nstruction of the dam, scheduled <br />to begin in 1968, will be comrleted l~te in 1971 To provide for the firsT re- <br />leases of irrigation and mun.icipcl ,10-:1 inc.ustrinl H:lt(;r from the reservoir in <br />1972. <br /> <br />Enlargement ~;f Tl-1in Lakes Dam <J.r:c. F:c3c::r'Joir will t'8.?,:in In 1968 and is <br />scheduled for e"mpl~tioL in 1971. <br /> <br />The first contract f~-:r' construc~i':)ll .)f the ;:.ower sjstem is scheduled for <br />1958 with initial power production fer 1972. <br /> <br />The ovcr211 ccmstruction p'2l"'i':'Jd f:'T th'3 project is expected to require <br />from 13 to 15 years to complete. <br /> <br />-7- <br />
The URL can be used to link to this page
Your browser does not support the video tag.