My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02515
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02515
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:37:19 PM
Creation date
10/11/2006 11:10:19 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.50
Description
CRSP - Power
Basin
Colorado Mainstem
Date
1/30/1962
Author
L. N. McClellan
Title
Report to the Engineering Committee of the Upper Colorado River Commission on the Transmission System for the Colorado River Storage Project
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />line or two 230 kv. lines (for greater reliability of service) <br /> <br />... would be included under this plan. This plan is designated as Plan <br /> <br />1. <br /> <br />Diagram, Fig. 2, illustrates this revised plan which <br /> <br />assumes all project power being marketed over an all-Federal system. <br /> <br />No wheeling of additional power is contemplated in this. plan_ <br /> <br /> <br />Two major possibilities have been proposed since the <br /> <br /> <br />Modi.fied Transmission System plan was developed. Either or both <br /> <br /> <br />would justify radical changes in the original plan. The first is <br /> <br />ariinterconnection at and interchange of power with a new large <br /> <br />thermal generating plant now being constructed at Four Corners, New <br /> <br />Mexico, by Arizona public Service Company. Under this plan, desig~ated <br /> <br /> <br />as plan 2, power would be transmitted from this plant by displacement <br /> <br /> <br />over the Project system. The second possibility proposed is the <br /> <br /> <br />construction of a large thermal generating station in northwestern <br /> <br />Colorado by an agency other than the Federal Government, and .the <br /> <br />interconnection of this plant with the project power system for the <br /> <br />initial primary purpose of transmitting large blocks of power over <br /> <br /> <br />the project system, principally by displacement with Glen Canyon <br /> <br /> <br />power, to the Phoenix market. This is Plan 3. In the case of power <br /> <br /> <br />interchange with the Four Corners plant, no wheeling charges are <br /> <br />~. <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.