My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02515
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02515
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:37:19 PM
Creation date
10/11/2006 11:10:19 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.50
Description
CRSP - Power
Basin
Colorado Mainstem
Date
1/30/1962
Author
L. N. McClellan
Title
Report to the Engineering Committee of the Upper Colorado River Commission on the Transmission System for the Colorado River Storage Project
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />fuel electric plant by the project would be made. <br /> <br />The financial effect and comparison of estimated surpluses <br /> <br />4It to the Basin Fund under these four plans, has been studied by the <br /> <br />Bureau. Estimated surpluses are preliminary and are for comparison <br /> <br />purposes only. Following is a summary of these preliminary <br /> <br />estimates, which are subject to further detailed substantiation and <br /> <br />change. <br /> <br />COMPARATIVE ESTIMATED SURPLUSES TO BASIN FUND UNDER PLANS 1 <br />TO 4 - PAYOUT PERIOD 1963 TO 2049 INCLUSIVE <br /> <br />Comparative <br />Surplus* <br /> <br />Plan 1. project operation independent of inter- $ 105,739,000 <br />connection with any fuel electric plant. <br />Diagram Fg. 1.. <br /> <br />Plan 2. Project operation with interconnection with 173,544,000 <br />A.P.S. Four Corners steam plant. No inter- <br />connection or integration <br />with large thermal electric plant in North- <br />western Colorado. Diagram Fig. ~,(Craig <br />steam plant omitted). <br /> <br />plan 3. Project operation with interconnection with 249,500,000# <br />A.P.S. Four Corners steam plant. Also <br />interconnection with and wheeling by project <br />of power from large steam plant in Northwestern <br />Colorado to Phoenix market area. <br />Diagram, Fig.~, (Craig steam plant included). <br /> <br />Plan 4. Project operation with interconnection with 88,472,000 <br />A.P.S. Four Corners steam plant. No inter- <br />connection with or wheeling from large steam <br />plant in Northwestern Colorado. A.P.S. to <br />contruct two 345 kv. lines from Glen Canyon <br />to pinnacle Peak and wheel available project <br />power to Arizona market in accordance with its <br />wheeling offer to the Bureau, Diagram, Fig. ~. <br /> <br />. <br /> <br />*Source of figures for plans 1, 2, and 4, are Bureau studies C, D. <br />and A, respectively, salt Lake city, Jan. 23, 1962. <br /> <br />#Surplus shown is $ 173,500,000 from plan 2, plus estimated $1,000,000 <br />annually for wheeling services, years 1973 to 2049, inc. <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.