Laserfiche WebLink
<br />c <br />, <br /> <br />, <br /> <br /><:., <br />c) b. <br />N <br />fl.l c. <br />w <br />"'"" <br /> d. <br /> e. <br /> f. <br /> <br />System operating reserves nay be too high. <br />Capacity available for narketing from load diversity nay <br />be greater than capacity lost due to system losses. <br />Replacerrent costs should be re-evaluated. <br />Extraordinary O&M expenses should be normalized. <br /> <br />Escalation of transmission service costs should be eliminated <br /> <br />from FRS. <br /> <br />g. Salinity costs should be eliminated from FRS, since they occur <br />after the five year cost evaluation period. <br /> <br />h. Irrigation assistancerequirerrents (irrigators I ability <br /> <br />to pay should be reviewed) . <br /> <br />i. M & I water rates should be raised. <br /> <br />j. Unidentified transmission facilities should be eliminated from <br /> <br />PRS. <br /> <br />4 <br />