My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02505
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02505
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:37:18 PM
Creation date
10/11/2006 11:09:23 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.470
Description
Pacific Southwest Interagency Committee
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
9/20/1984
Author
PSIAC
Title
Minutes of the 84-1 Meeting - September 20-21 1984
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />F. Stockton Creek Watershed Area'Study <br /> <br />A field review and meeting with local sponsors was made in <br />April 1984. Primary concerns are erosion and the resulting <br />sedimentation of a downstream domestic water supply reservoir. <br />The project does not appear to be economically justified for <br />implementation under the PL-566 program. A Field Review Report <br />summarizing our findings and recommendations for local action <br />will be prepared, <br /> <br />G. Sand Creek Watershed Area Study <br /> <br />A field review of the project area was made with the local <br />sponsors in April 1984. Upland erosion of orchards and vineyards <br />and flooding of the lower lying agricultural lands are the primary <br />concerns, The project has strong possibilities for a PL~566 pro~ <br />ject and a Detailed Work Outline will be prepared by September <br />1984. <br /> <br />Fl oOdp I a in' Mana~elllent . Studies' (FPMS) <br /> <br />u~per Penitencia Creek FPMS was initiated in January 1984. The <br />s udy 1S being conducted at a .level of intensity equal to pre- <br />authorization planning. If the project proves feasible, the <br />sponsors will request that the project proceed to work plan <br />development. <br /> <br />San Vicente Creek FPMS is scheduled to begin in October, Request <br />for approval of the Plan of Work (POW) and release of funds held <br />in reserve by National Headquarters was submitted in August. <br /> <br />C. Mint Canyon FPMS is scheduled to begin in January 1985, Approval <br />of the POW and, release of funds has also been requested. <br /> <br />A. <br /> <br />8, <br /> <br />RADO: Cooperative Studies. <br /> <br />Cooperative river basin reports have been completed for all basins in <br />the Colorado River drainage. <br /> <br />Dolores Project Area <br /> <br />A special study to identify conservation treatment needs on 28,000 <br />acres being converted from dry land agriculture to irrigated cropland, <br />as a result, the Dolores Project will be carried out in FY-85. <br />Irrigation types, cropping systems and erosion control practices will <br />be the major items studied. <br /> <br />Mancos Valley <br /> <br />The planning for this unit has been completed. The USDA Report is <br />being prepared. <br /> <br />D'-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.