Laserfiche WebLink
<br />118.; <br /> <br />. <br /> <br />If Project water is made available to the Southeastern Cblorado Water <br />O:mservancy District, the delivery will be made from Pueblo Reservoir <br />or upstream storage. If the water stored in Pueblo Reservoir is not <br />sufficient to ~t the demand, additional water will be released from <br />upstream storage. <br /> <br />Table 6 and Exhibit 10 show the proposed operation of Pueblo Reservoir <br />in water year 1978. <br /> <br />'lWin Lakes and Mt. Elbert Purrq:led-Storage PQ\\erp1ant <br /> <br />Testing of the equiprent in Mt. Elbert Pumped-Storage Powerplant has <br />J:eendelayed until October 1978. 'Ib make this test, project storage in <br />'!Win Lakes will have to be approximately 20,000 acre-feet to provide for <br />the inactive pool in Twin Lakes and the forebay. About one-half of <br />needed project storage has been a=umulated to date and the balance will <br />be stored by exchange during water year 1978. <br /> <br />. <br /> <br />. <br /> <br />13 <br />