Laserfiche WebLink
<br />003247 <br /> <br />5. M-X Missile Program. At present, the major Corps of Engineers effort is <br />in support of the Air Force in preparation of the Final Environmental Impact <br />Statement and Land Withdrawel Activities. Design has started on six projects <br />in the FY 82 program on a non-site specific base, but we have been directed by <br />Congress to stop all design effort until a basing mode decision is made and a <br />site is selected. We ~~e received Design Instruction from the Air Force for <br />the facilities in the F~ '83 program and have transmitted Design Directives on <br />those projects to the proper Design District for planning purposes until the <br />freeze on contract awards is lifted. There is also a hiring freeze, but <br />planning for staffing the CEMXPA organization is proceeding so that when the <br />freeze is lifted, we will be able to hire the people necessary to perform our <br />mission. <br /> <br />5 <br /> <br />~ ( <br />'f l I <br /> <br />i~ <br />