Laserfiche WebLink
<br />WATERSHED OPERATIONS <br /> <br />ARIZONA: <br /> <br />Buckhorn - Mesa Watershed <br /> <br />An alternative design estimate using large <br />diameter concrete pipe for the Signal Butte <br />Floodway has been completed. Relocation at Pass <br />MOuntain FRS slightly upstream is necessary. <br />Surveys and geological inve~tigations are under- <br />way. Preliminary designs for Signal Butte FRS are <br />completed. <br /> <br />Williams ..Chandler Watershed <br /> <br />Construction at RWCD Reach 1 is 95% completed. <br />Construction drawings for Reach 2 are under <br />contract. The Southern Pacific Railroad Bridge <br />crossing Reach 2 has been constructed. The <br />design has started on the SPRR Mainline Bridge <br />within. Reach 4. A Landscape Architect contract <br />is being negotiated for design of Reaches 1 and 2 <br />Harquahala Valley Watershed. <br /> <br />Construction of the Saddleback Diversion is 95% <br />complete. Construction of the Saddleback FRS is <br />started. A joint agreement has been made with the <br />Bureau of Reclamation for construction of Harquahala <br />FRS along Reach 5B, Granite Reef Aqueduct. A <br />contract for construction was awarded during July <br />to M. M. Sundt Co.. Tucson, AZ for $21.5 million. <br /> <br />A contract for design of the Centennial Levee is <br />being negotiated. <br />Frye Creek - Stockton Wash Watershed <br />The Graveyard Wash embankment repair was completed. <br />White Tanks Watershed <br /> <br />CALIFORNIA: <br /> <br />The design for embankment repair for Structures 3 <br />and 4 are completed. A construction contract is <br />being advertised. <br /> <br />Beardsley Watershed <br /> <br />Preparation of a supplemental watershed plan is <br />being scheduled for the fall of 1981. Designs <br />are being prepared on the Milligan Barranca drop <br />structure and Ferro debris basins. Both measures <br />are scheduled for award in FY-82. Remaining <br />planning channel work in Beardsley Creek Watershed <br />will not proceed until environmental clearance is <br />obtained on Point Mugu outlet. <br /> <br />-8- <br />