My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02395
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02395
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:36:33 PM
Creation date
10/11/2006 11:05:18 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8443.100
Description
Narrows Unit - Project Description
State
CO
Basin
South Platte
Water Division
1
Date
8/1/1966
Title
Report on the Narrows Unit Colorado South Platte Division Missouri River Basin Project part 1
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />. > <br />..:., I> . <br />11 '.t.. <br /> <br />Narrows Unit <br />August 1966 <br /> <br />BENEFITS AND COSTS <br /> <br />(Annual, 100-year analysis) <br /> <br />Benefi ts <br /> <br />Item <br /> <br />Direct <br /> <br />Total <br /> <br />Irrigation (250/265 prices) <br />Flood control ~ <br />Recreation ~ <br />Fish and wildlife enhancement ~ <br />Total <br /> <br />$1,631,500 <br />961,000 <br />790,000 E/ <br />~2,700 <br />l3, 75,200 <br /> <br />$1,410,000 <br />961,000 <br />790, 000 ~/ <br />292,700 <br />l3,453,700 <br /> <br />~ Benefits provided by cooperating agencies. <br />~/ Adjusted for time and rate of occurrence. <br /> <br />Costs <br /> <br />Item <br /> <br />Amount <br /> <br />Annual Equivalent of investment (lOO-years <br />@ 3-1/8%) <br />Annual OM&R <br />Dam and reservoir <br />Recreatton <br />Fish & wildlife management <br /> <br />:$2,10'( ,UOO ~/ <br /> <br />$26,300 <br />8Fi,oOO ~/ <br /> <br />area <br />Jackson Lake <br />Tot3.1 <br /> <br />37,cJOU <br />18,000 <br /> <br />168,200 <br />$2,275,200 <br /> <br />'.:;./ <br /> <br />Based on a net investment of $64,306,300 derived as follows: <br />project cost $61,820,000, minus future recreation develop- <br />ment $1,140,000, plus discounted future recreation develop- <br />ment $560,000, less road relocation (P. L. 87-874) $139,000, <br />less preauthorization investigations $1,702,000, plus <br />interest during construction $4,918,600, less road reloca- <br />tion during construction $11,300. <br /> <br />E/ Recreation <br />to reflect <br />analysis. <br /> <br />OM&R is adjusted dowmlard from $153,700 ultimate <br />rate and time of occurrence for benefit-cost <br /> <br />BENEFIT-COST RATIO <br /> <br />(lOa-year @ 3-1/8 percent) <br /> <br />Direct <br />Total <br /> <br />. . . . . , 1.52 <br /> <br />.. " . '" . . . 1.62 <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.