My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02391
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02391
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:36:32 PM
Creation date
10/11/2006 11:05:16 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8272.300.50
Description
Colorado River Basin Salinity Control Advisory Council
Basin
Colorado Mainstem
Water Division
5
Date
7/22/1976
Author
CRBSC Advisory Counc
Title
Report on Colorado River Basin Salinity Control Program - July 22 1976
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~. <br /> <br />. <br /> <br />. <br /> <br />Program Recommendations <br /> <br />Fiscal Year 1978 <br /> <br />N <br />c.n <br />00 The Advisory Council makes the following recommendations: <br />..... <br />Department of Interior - The Council recommends expeditious <br /> <br />completion of three of the four salinity ~nits authorized for <br /> <br />construction1 Grand Valley, Colorado, Paradox Valley, Colorado, <br /> <br />and Las Vegas Wash, Nevada. Funds in the amount of $2.08 million <br /> <br />have been appropriated to commence construction on the above projects <br /> <br />in Fiscal Year 1977. It is essential that this construction be <br /> <br />continued at the maximum possible rate. Complete and accurate <br /> <br />information on feasible construction schedules and specific dollar <br /> <br />amounts are not available to the Council at this time. On the <br /> <br />basis of what information is available, it is recommended that <br /> <br />the Bureau of Reclamation include in its budget for Fiscal Year 1978 <br /> <br />funding for construction in the approximate amount of: <br /> <br />Grand Valley Unit <br /> <br />$ 3.5 million <br /> <br />Paradox Valley Unit <br /> <br />3.0 million <br /> <br />Las Vegas Wash Unit <br />first stage <br /> <br />3.5 million <br /> <br />$ 10.0 million <br /> <br />Investigation and planning on the other salinity control units and <br /> <br />other activities indentified as the Water Quality Improvement Program <br /> <br />should be continued at the current level of about $2 million. Most <br /> <br />of the proposed salinity control projects include evaporation pond <br /> <br />facilities whether control is solar evaporation of saline source <br /> <br />water or evaporation of the brine reject stream following desalting. <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.