My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02331
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02331
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:36:14 PM
Creation date
10/11/2006 11:03:10 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.05.R
Description
Hoover Dam/Lake Mead/Boulder Canyon Project
Basin
Colorado Mainstem
Date
1/6/1983
Title
Hoover Settlement Principles
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1/6/83 <br /> <br />l'fi5]@~,_ . <br />-.gf~JgVS::;) <br />Der.o fIJ' . '/ <br />f r..71983 ~ <br />" Co' . ',' <br />l,o".}e:'fAD'7J:--: . <br />"b W~f"'L' Y II <br /> <br />':' .',1."':.,,' '.", r;;. <br />cri teria (Opl::i6'ti>,p[~' . <br /> <br />.1'- <br /> <br />-r- <br />.... <br />c <br />f"'. <br /> <br />t,c <br /> <br />Hor 'sR SETTLEtlENT PRINCIPLE. <br /> <br />L <br /> <br />Western's August 1982 proposal <br /> <br />. serves as a basis for contract rene'~als 'vi th neN Hoover resource <br /> <br />defined therein (totaL allocation 1,904 1m. and 4.3 billion kwh). <br /> <br />2. Winter season unit outage capacity shall be <br /> <br />. n . <br />,eliminated, and l~estern shall market l,904'mw of contingent <br /> <br />capacity on a year round basis for the 30"year contract term. <br /> <br />.. <br /> <br />.- <br /> <br />3. The Navajo resource will be allocated to Arizona on <br /> <br />a cost-of-service basis. <br /> <br />. 4. Western. to increase allocation of Hoover energy <br /> <br />from 4.3 billion kwh as specified ip the Qarketing criteria to <br />4.5 billion kvlh and allocate the additional 200',000,000 kNh to <br /> <br />the State of Nevada. <br /> <br />-. <br /> <br />5. Cost of purchased energy, uprating, 0, M & Rand <br /> <br /> <br />amortization is to be melded Nith basic project costs for rate <br /> <br />determination. <br /> <br />6. Excess energy generated at Hoover Pmver Plant in <br /> <br />excess of 4.5 billion kwh annually shall be allocated as follows: <br /> <br />- <br />, <br /> <br />2.. The first 200,000,000 kHh to go to Arizona. <br /> <br />22 <br /> <br />.'l"r. <br />
The URL can be used to link to this page
Your browser does not support the video tag.