Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />To allow for the use of the second development allowance, the following process is used: <br /> <br />a) for large modification of Paragraph 4, recalculate and modify the instream flow <br />appropriation as done originally and recalculate the monthly instream flow call <br />trigger, and <br />b) for small modifications of Paragraph 4 recalculate the monthly instream flow <br />call trigger only. <br /> <br />To administer the instream flow appropriation, the Division Engineer/CWCB track running <br />monthly 10 year volumes at the Maybell gage. <br /> <br />When the running monthly 10 year volume is less than the monthly instream flow call <br />trigger junior rights will be called out to meet the instream flow appropriation. <br /> <br />c:\miscel\su604Ilalt <br />