Laserfiche WebLink
<br /> <br /> <br /> <br />. <br /> <br />. <br /> <br />c,:> <br />1.-) <br />N <br />CO <br />tv <br />(Q <br /> <br />Assuming an average trip length of 12 days <br />for oar-powered craft and an average trip <br />length of 7 days for motorized craft, a min- <br />imum of 5 days must elapse after an oar launch <br />and prior to a motor launch to assure ther is <br />no meeting of these groups on the river. Only <br />those groups launching during the first 10 days <br />of the two-week period would be assured of not <br />encountering motorized craft. <br />Under this alternative, severe scheduling <br />problems would result. Guides hired by con- <br />cessioners might have to be laid off during the <br />two-week periods or employers would incur the <br />cost of idle employees. Equipment would also <br />be idle and perhaps have to be stored during <br />these times. In addition, due to six weeks <br />of non-motorized use, all commercial operators <br />might not have an opportunity to utilize their <br />entire user day allocation. <br /> <br />10 <br /> <br />