Laserfiche WebLink
<br />Introduction <br /> <br />The operation of the Colorado River Basin during the past <br />year and the projected operation for the current year reflect <br />flood control, river regulation, benefici<;\1 consutnpti\e uses, <br />hydroelectric power generation, water quality control, <br />enhancement of fish and wildlife, recreation, and Colorado <br />River Compact requirements. <br /> <br />Storage and release of-water from the Upper Basin reservoirs <br />are governed by all applicable laws and agreements <br />concerning the Colorado River, including the impoundment <br />and release ofwaler in the Upper Basin required by Section <br />602(a) of the Colorado River Basin Project Act of September <br />30, 1968 (Public Law 90-537). The. operation of the Lower <br />Basin reservoirs reflects Mexican Treaty obligations and <br />Lower Basin contractual commitments. <br /> <br />Nothing in this report is intended to interpret the provisions <br />of the Colorado River Compact (45 Stat. 1057), the Vpper <br />ColoradoRi",r Basin Compact (63 Stat. 31),the Water Treaty <br />of 1944 with the V nited Mexican Slates (Treaty Series 994, 59 <br />Stat. 1219), the United States/Mexico agreement in Minute <br />No. 242 of August 30, 1973,(TreatySeries 7708; 24 VST 1968), <br />the Decree entered by the Supreme Court oflhe U niled States <br />in Arizona v, California et al. (376 V.S. 340), the Boulder <br />Canyon Project Act (45 Stat. 1057), the Boulder Canyon <br />Project Adjustment Act (54 Stat. 774; 43 V.S.c. 618a), the <br />Colorado Ri"'r Storage Project Act (70 Stat. 105; 43 V.S.C. <br />620), the Colorado River Basin Project Act (82 Stat. 885; 43 <br />U .S.C. 1501), the Colorado River Salinity Control Act (88 <br />Stat. 266;43 V.S.C. 1951),or the Hoover Power Plant Act of <br />1984 (98 Stat. 1333). <br /> <br />Authority for Report <br /> <br />Pursuant to the Colorado River Basin Project Act (Public <br />Law 90-537) of 1968, 1 am pleased to present to the Congress, <br />and to the Governors oflhe Colorado River Basin Slates, the <br />twentieth annual report on the Operation of the <br />Colorado River Basin. <br /> <br />This report describes the actuaJ operation oflhe reservoirs in <br />the Colorado River drainage area constructed under the <br />authority of the Colorado River Storage Project Act, the <br />Boulder Canyon Project Act, and the Boulder Canyon Project <br />Adjustment Act during water year 1990, and the projected <br />operation of these reservoirs during \\'ater year 1991 under the <br />"Criteria for Coordinated Long-Range Operation of <br />Colorado River Reservoirs," (Operating Criteria) published <br />in the Federal Register June la, 1970. <br /> <br />The Operating Criteria and Section 602 of Public Law 90-537 <br />mandate consultation with representatives of the Governors <br />of the seven Basin States and the Upper Colorado River <br />Commission relative 10 annual plans for operation of the <br />Colorado River reservoirs. The 1991 Annual Operating Plan <br />(AOP) was prepared by the Bureau of Reclamation in <br />consultation with the seven Basin States Governors' <br />representatives, the Upper Colorado River Commission, and <br />others. <br /> <br />Manuel Lujan, Jr., Secretary <br />United States Department of the Interior <br />