Laserfiche WebLink
<br />CONTENTS <br /> <br />Introduction . . . . . . . . . . . . . . . . . . . . . . . <br />Au1hority for Report .................. <br />Actual Operations Under Crileria - Wa1er Year 1990 <br />Projected Plan of Operation - Water Year 1991 <br />Determination of "602(a) Storage" <br />Mexican Treaty Obligations <br />Projected Plan . . . . . . . . . . . <br />Upper Basin Reservoirs <br />Fontenelle Reservoir (Green River) <br />Flaming Gorge Reservoir (Green Rh"r) . <br />Wa)ne N. Aspinall Unit - Blue Mesa, Morrow Point, and <br />Crystal Reservoirs-- (Gunnison River) <br />Navajo Reservoir (San Juan River) <br />Lake Powell (Colorado Rh"r) <br />Lo~r Basin Resenroirs <br />Lake Mead (Colorado Rh"r) <br />Lake Moh.ve (Colorado River) <br />Lake Havasu (Colorado River) <br />River Regulalion . . . . . . . <br />Flood Con1rol ........ <br />Beneficial Consumptive Uses <br />Upper Basin Uses and Losses <br />Lower Basin Uses and Losses <br />Water Use by States . . . . . . <br />Power Operations and Major Maintenance Activities <br />Upper Basin - Colorado River Storage Project <br /> <br />Lower Basin ................... <br /> <br />1 <br />I <br />2 <br /> <br />.3 <br />.3 <br />.4 <br /> <br />.5 <br />.7 <br /> <br />.9 <br />11 <br />13 <br /> <br />15 <br />17 <br />19 <br />21 <br />22 <br /> <br />23 <br />23 <br />24 <br /> <br />25 <br />27 <br /> <br />United States <br />Department of the Interior <br />Bureau of Reclamation <br /> <br />January 1991 <br /> <br />Prepared pursuant to the ColoTado River <br />Basin Project Act of 1968 <br />Public Law 90-537 <br />