My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02214
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02214
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:35:19 PM
Creation date
10/11/2006 10:59:07 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8272.600.60
Description
Colorado River Basin Salinity Control Program - Basin Member State Info - Utah
Basin
Colorado Mainstem
Water Division
5
Date
9/1/1991
Title
Upper Colorado River Basin Rangeland Salinity Control Project - Natural Resource Inventory - Phase I Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />7 <br /> <br />~ <br />~ <br />C) <br />C) <br /> <br />The following eight watersheds were designated for Phase II <br />detailed evaluation: <br /> <br />14030001-070 <br />14060005-010 <br />14060005-020 <br />14060009-020 <br />14060009-030 <br />14070003-070 <br />14070007-010 <br />15010003-010 <br /> <br />Sagers Wash Watershed <br />Upper pariette Draw Watershed <br />Lower pariette Draw Watershed <br />Castle Dale Watershed <br />Ferron ,Watershed <br />Sweetwater Creek Watershed <br />Tropic Watershed <br />Kanab Creek Watershed <br /> <br />The complete listing of the resource inventory parameters by <br />watershed number is given in Appendix I. The Phase I <br />inventory is a first level targeting procedure to identify <br />individual watersheds that are actively yieldingnonpoint <br />source pollution of sediment and salt to the Colorado River <br />Basin. These watersheds contain areas that are in severely <br />eroding condition, high salt yielding condition and in need <br />of coordinated resource planning. This inventory procedure <br />is a management tool for identifying and targeting <br />watersheds in need of detailed evaluation under Phase II of <br />this project. ' <br />
The URL can be used to link to this page
Your browser does not support the video tag.