My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02209
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02209
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:35:17 PM
Creation date
10/11/2006 10:58:58 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.50
Description
CRSP - Power Marketing
Basin
Colorado Mainstem
Date
6/10/1982
Author
USCOE/WAPA
Title
Public Information Forum, Post 1989 Power Marketing Plan - Customer Comments
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
188
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~lr. Al Gabiola <br />August 3, 1982 <br />Page 2 <br /> <br />should not be subject to Change in the post-1989 <br />period. <br /> <br />Contract Term <br /> <br />. <br /> <br />The Authority believes that CRSP power contracts <br />should be renewed for a period of not less than 20 <br />years. Short-term contracts do not allow adequate <br />resource planning and only add to the overall admini- <br />strative costs for both Western and its preference <br />purchasers. Adequate language could be added to new <br />CRSP contracts which would provide Western with protec- <br />tion should hydrologic conditions change on the <br />Colorado River. <br /> <br />CRSP Load Factor <br /> <br />Long-term firm power contracts (capacity with <br />energy at 58.2 percent load factor) should be continued <br />in the post-1989 period. An option to purchase hydro- <br />electric capacity at an even higher load factor <br />(greater than 58.2 percent) should also be offered to <br />CRSP preference customers. If necessary, excess energy <br />could be purchased in years of hydroelectric energy <br />shortage to firm such contract commitments. <br /> <br />Reserve <br /> <br />Existing CRSP marketing criteria provide for 10 <br />percent reserve for CRSP power. This reserve amount <br />has proven adequate during past years and should be <br />continued in future contract commitments. <br /> <br />Glen Canyon Water Release Pattern <br /> <br />The Authority fully supports the uprating program <br />proposed by the Bureau of Reclamation at Glen Canyon <br />and the continuation of operating criteria designed to <br />meet customers' load requirements. Minimum releases <br />should not be influenced by special interest groups in <br />order to provide for a more convenient recreational <br />boating on the Colorado River below Glen Canyon Darn. <br />(See the Authority's letter to Clifford Barrett dated <br />May 3, 1982, copy enclosed.) <br /> <br />proiect Use Power <br /> <br />project Use Power should be marketed by Western to <br />preference customers on a recapture basis. This power, <br />when needed by the Bureau uf Reclamation, could be <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.