Laserfiche WebLink
<br />San Juan-Chama <br />Water Accounting <br />Albuquerque Area Office <br />June 1997 <br /> <br />The natural inflow into Heron Reservoir during the month of June was computed to <br />be 141 acre-feet (AF) as shown in Table 3. There were 1883 AF net San Juan-Chama <br />(SJ-C) losses, as shown in Table 2. There were 48442 AF of diversions through <br />Azotea Tunnel th is month. <br /> <br />There was a total of 141 AF of Natural (RG) rel eased from Heron, of which the <br />total was seepage. <br /> <br />There was 1.32 inches of precipitation at <br />June (running) average of 0.91 inches. <br />Reservoir are summarized in Tables 1-3. <br /> <br />Heron Reservoir, which is 146% of the <br />The monthly computat ions for Heron <br /> <br />There were no SJ-C releases from El Vado or Abiquiu for the month of June. <br /> <br />Total inflow into Nambe Falls Reservoir was computed to be 3312 AF. The <br />evaporation loss's on the reservoir were 14 AF. Table 4 summarizes San Juan- <br />Chama water at Otowi. <br /> <br />Estimated sediment deposition in the San Juan-Chama pools at Abiquiu and Jemez <br />Canyon Reservoirs, and Cochiti Lake are presented in Tables 5A-5C. Storage and <br />evaporation of Rio Grande water in El Vado and Abiquiu Reservoirs are shown in <br />Table 6. <br /> <br />All data are provisional and subject to revision as final data are collected and <br />analyzed. <br />