Laserfiche WebLink
<br />SUMMARY SHEETS (Continued) <br /> <br />. <br /> <br />UNIT FEATURES (Continued) <br /> <br />Pipelines (feet) <br />Hanksville Salt Wash <br />PVC pipe <br />Steel injection pipe <br />Subtotal <br /> <br />Emery South Salt Wash <br />PVC pipe <br />Steel injection pipe <br />Subtotal <br /> <br />Total <br />12-kilowatt power transmission lines (miles) <br />Hanksville Salt Wash <br />Emery South Salt Wash <br />Total <br />Access roads (miles) <br />Hanksville Salt Wash <br />Emery South Salt Wash <br />Total <br /> <br />1,825 <br />900 <br />2,725 <br /> <br />6,300 <br />900 <br />7,200 <br />9,925 <br /> <br />13.2 <br />12.4 <br />25.6 <br /> <br />5.6 <br />8.4 <br />14.0 <br /> <br />. <br /> <br />ESTIMATED COSTS ($1,000) <br /> <br />Construction (total features) <br />Engineering and overhead <br />Advance planning <br />Interest during construction <br />Total capital cost <br /> <br />8,120 <br />2,680 <br />950 <br />1,596 <br />13,346 <br /> <br />Annual capital cost (50-year life at 8.625 <br />percent interest) <br />Annual operation, maintenance, and replacemen~1 <br />Annual costs for monitoring riparian vegetation <br />Total annual costs <br /> <br />1,170 <br />848 <br />3 <br />2,021 <br /> <br />COST EFFECTIVENESS <br /> <br />Dollars per ton of salt removed <br /> <br />97 <br /> <br />. <br /> <br />II This cost reflects the marginal cost of power. CRSP power may <br />be used on this unit, lowering the operation, maintenance, and replace- <br />ment cost to $583 and the cost effectiveness to $84 per ton of salt re- <br />moved. <br /> <br />002341 <br /> <br />S-2 <br />