My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02156
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02156
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:34:55 PM
Creation date
10/11/2006 10:56:51 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.300.10
Description
Lower Gunnison Basin Unit - Colorado River Salinity Control Program - Winter Water Replacement
State
CO
Basin
Colorado Mainstem
Water Division
4
Date
7/1/1987
Title
Lower Gunnison Basin Unit (Winter Water) Preconstruction Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Chapter I <br /> <br />Chspter II <br /> <br />Chapter III <br /> <br />Chapter IV <br /> <br />Chapter V <br /> <br />Chapter VI <br /> <br />CONTENTS <br /> <br />Introduction. . . . . . . <br />Authority and purpoae. <br />Setting. . . . . . . . <br />Water-user organizations <br />Plan of development . . <br />Program concepts and estimated salt-load <br />reduction.. ....... <br /> <br />. <br /> <br />Scope. . . . . . . . . . . . . . <br />Major features of the program. <br />Off-farm features <br />On-farm features. <br />Rights-of-way. <br />Off-farm. . <br />On-f arm . . <br />Administration . <br />Conditions precedent to construction <br />Estimated costs. . . . . . . . <br />Development program.. ... . . . <br />Environmental, social, and cultural resources <br />considerations . .. .. . . . <br />Environmental protection measures <br />Environmental commitments . . . <br />Development of designs and estimates. <br />Source of design data. . . . . . <br />Design methodology and concepts. . <br />Cost summary . . . . . . . . . . . <br />Cost estimate changes since Fessibility <br />Report/Finsl Environmental Statement . <br />Design and estimate activities necessary <br />before construction. . . . . . . . <br />Field inspection .. .. . . . . <br />Operation, maintenance, and replacement <br />Introduction <br />Annual costs . . . . . . . . <br />Contracts. . . . . . . . . . <br />Financial and economic analysis <br />Introduction . . . . . . . . <br />Construction cost. . . . . . . <br />Interest during construction . <br />Operation, maintenance, and replacement costs. <br />Cost-effectiveness (economic) analysis . . <br />Cost allocation and repayment (financial) <br />analysis . . . . . . . . . . . . . . . . <br />Social considerations and public concerns . . . <br />Changes in social impacts since Feasibility <br />Report/Final Environmental Statement . . <br />Public involvement issues encountered and <br /> <br />. <br /> <br />. <br /> <br />resolved . . . . . . . . . . . . . . . . <br /> <br />Page <br />---r <br />1 <br />1 <br />3 <br />5 <br /> <br />5 <br />5 <br />6 <br />6 <br />12 <br />13 <br />13 <br />13 <br />13 <br />14 <br />15 <br />16 <br /> <br />. <br /> <br />16 <br />16 <br />18 <br />20 <br />20 <br />20 <br />23 <br /> <br />23 <br /> <br />27 <br />27 <br />28 <br />28 <br />28 <br />32 <br />39 <br />39 <br />39 <br />39 <br />39 <br />40 <br /> <br />41 <br />43 <br /> <br />43 <br /> <br />45 <br /> <br />0:17.8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.