<br /> <br />'. <br /> <br />L. M, ALEXANDER <br /> <br />Slide 10 see on this construction schedule, <br /> <br />Major equipment items are on order, representing about one-half of the estimated 309 million <br />dollar plant cost, The plant represents probably the largest thermalelectric plant ever undertaken <br />under one contract, It will allow the participants and the government to take full advantage of the <br />Slide 11 inherent "economies of scale," The 800 mile, 500 KV transmission system on a "first estimate" will <br />cost an additional $165,470,000. The Salt River Project will construct and operate the plant-Arizona <br />Public Service Company will build the 500 KV transmission lines and substations into Phoenix, and <br />the Los Angeles Department of Water & Power will construct the transmission facilities to the <br />Slide 12 Colorado River. Rail facilities from the Black Mesa coal area will cost an additional $21 million. <br />The mining facilities will be installed by Peabody Coal Company in conjunction with the terms of the <br />coal supply contract. <br /> <br />That, ladies and gentlemen, is a very over-simplified story of how we have progressed on the <br />vital Navajo Project. Our remaining task is to build a big, rugged, dependable plant-to the budget, <br />and on schedule-but a plant which at the same time will be a good neighbor, Being a good neighbor <br />is part of our "Recipe" for a power development. <br /> <br /> <br />It must provide benefits to the area of its locale, as well as to its owners-it must in fact lift the <br />spirit of a person looking at it, <br /> <br />Slide 13 In order for us to make use of the coal and water, which were controlled in major part by the <br />Navajo Tribe of Indians, we had to agree with their requirement that the plant be built on the <br />Reservation, <br /> <br />The Navajos in turn will receive a number of benefits for the use of coal from their Reservation <br />and their claim to water from Arizona's Upper Basin Colorado River allotment. The Hopis will <br />benefit too from their claim. In both construction and operation, Indians will be given utmost con- <br />sideration for jobs for-.which they are qualified. <br /> <br />Slide 14 Coal royalties to the Navajo Tribe will amount to $1,800,000 a year. To rent the plant site we <br />will pay the Indians an additional $160,000 annually. There are other payments too for right-of-ways <br />and permits. The participants will also make available to the Navajos about 60,000 KW of electricity <br />from the Navajo plant for their future economic development. Finally, we will financially help to <br />support the Navajo Community Junior College from which we hope to employ trained people. <br /> <br />The plant and transmission system will represent a substantial tax base to the areas in which <br />the facilities are located. <br /> <br />But this brings up an interesting point, and emphasizes the social changes affecting utilities. <br />People the country over are more than happy to have the assessed valuation of such a facility in <br />their tax district, but nearly all want it to be located at the other end of the district-anywhere <br />else-just away from them. It's also paradoxical that people want more and more power every year <br />but they don't want to see the facilities for making it, or for transmitting it to their homes. <br /> <br />Power plants have been thought of as bad neighbors that belch huge columns of thick black <br />smoke which will cause soot and dust to settle, blackening the area and killing plants. <br /> <br />We sincerely believe that we can and will make the Navajo Want a good neighbor-something to <br />see and visit along with Page and Glen Canyon Dam, and the wonderful recreation areas in that <br />vicinity. <br /> <br />-25- <br />