My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP02047
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP02047
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:34:07 PM
Creation date
10/11/2006 10:53:11 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8221.112.A
Description
Central Arizona Project
State
AZ
Basin
Colorado Mainstem
Date
1/1/1991
Title
Special Delivery to Tucson--A History and Overview of the CAP
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />o <br />I;z <br />M <br />o <br />o <br /> <br />(continued) <br />The demands of the 20th century led <br />to a greatly expanded water system for <br />mcson with dozens, then hundreds of <br />wells, and modern turbine pumps. The <br />surface water in the Santa Cruz Valley had <br />virtually disappeared and mcson began <br />relying on groundwater alone, Water con. <br />servation became a necessity. In the <br />mid-1970s, meson Water began "Beat the <br />Peak," a water demand management pro- <br />gram that became one of the most suc- <br />cessful of its type in the United States, <br /> <br />An acre-foot of water would cover a <br />football field (without the end zones) <br />with 0 foot of water. <br /> <br />2 <br /> <br />As fast as concerns about future <br />groundwater supplies grew, mcson's pop- <br />ulation and water usage grew even faster. <br />In 1980, the Arizona State Legislature <br />passed the Groundwater Management <br />Act, drafted to provide guidelines and <br />requirements for the management and <br />regulation of groundwater. Three of these <br />requirements were to significantly influ- <br />ence Tucson's future water use, <br />First, the Safe Yield portion of the Act <br />set the goal of creating a long-tenn bal- <br /> <br />ance between the amount of groundwater <br />withdrawn for use and the amount of <br />water recharged to the aquifer. The Act <br />also requires a 100-Year Assured Water <br />Supply. By the year 2001, mcson must be <br />able to confinn that there is enough water <br />of satisfactory quality to meet the needs <br />of existing and proposed development in <br />the area for 100 years, Finally, the Act <br />ordered progressively more demand- <br />ing conservation requirements for <br />groundwater. <br /> <br />(continued on page 4) <br /> <br />One Acre-Foot of Water <br /> <br /> <br /> <br />- <br /> <br />,"'^' <br /> <br />.~," <br /> <br />"'~' ..$.< ~.,.~.-." <br /> <br />,.;., <br />/ / <br />~......- <br /> <br />_n".," ;_ <br /> <br />",' <br /> <br />h",")'I~, <br /> <br />, "'-" <br /> <br />/~/ <br /> <br /> <br />"', <br /> <br />-"":",,,- <br /> <br />/7~.. <br />L-.::::::::../z..;:;. <br /> <br />./' / <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.