Laserfiche WebLink
<br />....A.. l ~3 <br />u:JC:2~ <br /> <br />'. <br /> <br />Parcel Number <br /> <br />NP-l <br />NP-2 <br />NP-3 <br />MP-l <br />MP-2 <br />MP-3 <br />MP-4 <br />MP-5 <br />MP-6 <br />MP-? <br />MP-8 <br />MP-9 <br />MP-lO <br />MP-ll <br /> <br />Land Use Priori tv <br /> <br />Wildlife (Limited) <br />Recreation (Limited) <br />Wildlife (Limited) <br />Recreation (Limited) <br />Protected Area (Threatened and Endangered Plant Habitat)(Limited) <br />Protected Area (Threatened and Endangered Plant Habitat)(Limited) <br />Wildlife (Limited) <br />Wildlife (Limited) <br />Livestock Grazing and Water (along Barger Gulch) (Limited) <br />Recreation (Limited) <br />Wildlife (Limited) <br />Livestock Grazing (Limited) <br />No Priority (Limited) <br />Protected Area (Threatened and Endangered Plant Habitat) (Limited) <br /> <br />In addition. the RMP would be amended to indicate environmental assessments prepared for future land <br />exchanges or other land acquisitions would establish planning prescriptions and land use priorities for <br />acquired lands as part of the acquisition process. <br /> <br />ALTERN A TIVES: <br /> <br />No additional alternatives beyond the proposed action and no action alternative would be analyzed in <br />this document. <br /> <br />NO ACTION: <br /> <br />Under the no action alternative, land use priorities would not be established for the acquired lands. This <br />would leave the lands without benefit of clear planning direction. This would result in continued <br />management controversy and is not acceptable from a statutory or regulatory perspective. <br /> <br />ALTERNATIVES CONSIDERED Bur ELIMINATED: <br /> <br />The rationale for acquisition of the lands being considered in this document was considered during <br />scoping discussions and/or environmental assessments prepared for each acquisition. This process <br />exposed each acquisition to a thorough consideration of acquisition rationale and provided the decision <br />maker with numerous alternatives for acquisition and future management. No other managemen.t options <br />beycnd those considered during the processing of each acquisition warrant further consideration at this <br />time. <br /> <br />AFFECTED ENVIRONMENT/ ENVIRONMENTAL <br />IMPACTS/RESIDUAL IMPACTS <br /> <br />GENERAL SETTING: This proposal affects lands located throughout the Kremmling Field Office. The <br />RMP provides a general overview. as well as specific descriptive information on the physical and social <br />resources of the area. Information is referenced throughout this envircnmental assessment about <br /> <br />5 <br />