Laserfiche WebLink
<br />..-j <br />'~J <br />m <br />'''' <br /> <br />TABLIl 1-1 <br /> <br />SCENARIO <br /> <br />DEFINITION <br /> <br />A <br /> <br />Minimum project scope <br />and configuration <br /> <br />B <br /> <br />Intermediate project <br />scope and configuration <br /> <br />C <br /> <br />Full project scope <br />and configuration <br /> <br />D <br /> <br />Maximum project scope <br />and configuration with <br />imported water <br /> <br />1-6 <br /> <br />ITEMS INCLUDED <br /> <br />Supplemental (late seasonl <br />irrigation water for <br />presently irrigated lands <br />in the West Divide Creek <br />basin. <br /> <br />Supplemental (lat~ season) <br />irrigation for pr~sently <br />irrigated lands in the <br />West Divide Creek, East <br />Divide Creek and Mamm <br />Creek Basins. Irrigation <br />water for new irrigated <br />lands on Hunter Mesa. <br /> <br />Same as B plus water for <br />irrigation from OWens <br />Creek Basin, Thompson Creek <br />Basin (Yank Creek Dam) <br />and Beaver Creek Basin is <br />developed within their <br />respective basin; and pro- <br />visions for storage of <br />municipal and industrial <br />water is to be considered. <br /> <br />Same as B plus water for <br />irrigation from the <br />Buzzard Creek Basin is <br />imported to the West <br />Divide Creek basin for use, <br />by existing and new irri- <br />gated lands. <br /> <br />;;: <br /> <br />2 <br /> <br />:;: <br />