Laserfiche WebLink
<br />- - <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- - <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />- <br /> <br />Table 1. Preliminary Regulatory Issues and Permitting Requirements <br /> <br />Aaencv Action I Citation I Aoolicabllltv <br />FEDERAL <br />US Bureau of Reoperalion of Storage Change in Operating Required for project reoperation or Pueblo or Turquoise reservoir enlargement <br />Reclamation Proiect facilitv enlarqement Principles <br />US Army Corps of Section 404 Dredge and Clean Water Act 33 Regulate discharge of dredged and fill material into waters of the US, including <br />Engineers Fill Permit USC 1251 wetlands, dams, diversion structures, roads, pipelines, waste stockpiles, etc. <br /> Requires compliance with NEPA, ESA, NHPA, FWCA, and 404 (b)(l) <br /> evaluation. Also needs State 401 certification. <br />US Fish and Section 7 consultation on Endangered Species Prerequisite to NEPA compliance and 404 permit decision. Ensures threatened <br />Wildlife Service threatened and Act, 16 USC 1531 et and endangered species are not adversely affected by the project. <br /> endanqered species sea. <br /> Fish and Wildlife Fish and Wildlife Prerequisite to 404 permit decision. USFWS and CDOW prepare impact <br /> Coordination Act Coordination Act, 16 analysis and mitigation recommendations for fish and wildlife resources. <br /> Comoliance USC 661 et sea. <br />US EPA NEPA Compliance National Lead Federal agency prepares EA or EIS for major federal actions. EPA has <br /> Environmental Policy formal authority with respect to NEPA compliance. <br /> Act, 42 USC 4321 et <br /> seq.; Clean Air Act <br /> Section 309 <br /> Section 404 (b) (t) Clean Water Act, 33 EPA has broad oversight and veto power over Corps of Engineer's 404 permit <br /> Compliance Review USC 1251 et sea. decisions. Criteria include water auality, alternatives, T&E soecies, mitiaation. <br />US Advisory Cultural Resource National Historic Prerequisite to NEPA compliance and 404 permit decision. Protects cultural, <br />Council on Historic Clearance Preservation Act, 16 historic, and archeological resources in the project area. <br />Preservation USC 470a et esa. <br />US Forest Service Special Use Permit Federal Land Policy Required for temporary use of national forest system lands, both for <br /> and Management Act; preconstruction site evaluation and project construction and operation. NEPA <br /> National Forest compliance required. <br /> Manaaement Act <br /> Forest Plan Consistency National Forest Project must be consistent with forest plan. Amending the plan may be <br /> Manaaement Act necessarv. NEPA compliance reauired. <br /> Land Tenure Adjustment Required for permanent ownership of forest system lands, either through <br /> purchase or exchanqe. NEPA compliance and Conqressional Aooroval reauired. <br /> Timber Sale Contract National Forest For clearing of timber from reservoir pool, road corridors, construction sites, etc., <br /> Manaaement Act on Fmest Service Land. <br />US Bureau of Land ROW or Temporary Use Federal Land Policy For temporary use of BLM land. NEPA compliance required. <br />Manaaement Permit and Manaaement Act <br />Federal Emergency Floodplain Management E.O.11988 Whenever floodplain may be changed by a project. <br />Manaaemenl Act <br /> <br />~ <br /> <br />2 <br /> <br />- - <br /> <br />N <br />W <br />t) <br /> <br />c.) <br />