My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01970
CWCB
>
Water Supply Protection
>
Backfile
>
2001-3000
>
WSP01970
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:33:39 PM
Creation date
10/11/2006 10:47:17 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.131.G
Description
Yellow Jacket Project
State
CO
Basin
Yampa/White
Water Division
6
Date
7/27/1966
Author
CWCB
Title
Water Supply Studies: Yellow Jacket Project & Rocky Mountain Power Co. Project on the White River Colorado
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />o <br />~ <br />N <br />N <br /> <br />J <br /> <br />2. Bypass for fishery purposes below Yellow Jacket Diversion Dam _ <br /> <br />30 c.f.s. min. non-irrigation season, 70 c.f.s. min. during irri- <br /> <br />gat ion season. <br /> <br />3. Humble Oil Co. Sweetbriar Res. 10,700 A.F. each year from South Fork <br /> <br />White River. <br /> <br />4. Piceance pipeline from So. Fork White River - 35 c.f.s. 7 months, <br /> <br />(Non-Irrigation season) , 70 c.f.s. 5 months, (irrigation season). <br /> <br />5. Historic diversion to senior rights, White River, except as noted: <br /> <br />A. Oak Ridge Park Ditch enlargement to 121 c.f.s.; diversions <br /> <br />increased 181% but do not exceed 121 c.f.s. <br /> <br />6. Water rights of the Yellow Jacket Project considered senior to <br /> <br />Rocky Mountain Power Company, either by decree or by stipulation. <br /> <br />Case II - Power decree of 180 c.f.s. at original location. <br /> <br />1. Items 1 through 6, Case I, the same. <br /> <br />2. 180 c.f.s. at original location. <br /> <br />3. Return flow from power plant available to supply rights below Meeker <br /> <br />Canal, return to river is considered to be below the Meeker Canal and <br /> <br />above the Niblock Ditch. <br /> <br />Case III - Power decree of 180 c.f.s. transferred to Highland Ditch. <br /> <br />1. Items 1 through 6, Case I, the same. <br /> <br />2. 180 c.f.s. transferred to Highland Ditch. <br /> <br />3. Return flow from power plant available to supply rights below Meeker <br /> <br />Canal. Return to river is considered to be below the Meeker Canal and <br /> <br />above the Niblock Ditch. <br /> <br />. -". <br /> <br />',. .;' <br /> <br />\...'. <br /> <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.