My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01948
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01948
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:33:31 PM
Creation date
10/11/2006 10:46:03 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.10.B
Description
UCRBRIP Annual Report
Basin
Colorado Mainstem
Date
4/9/2003
Author
UCRBRIP
Title
2002 Annual Reports Package Part 2
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Preparation of final reports and submittal of Regional General Permit 057 were <br />completed for the Walter Walker, Butch Craig, and Grand Junction Pipe sites. Review of plans <br />and proposed construction for these sites were discussed. <br /> <br />Because of low runoff flows during 2002, post-restoration erosion and sedimentation <br />monitoring were not performed at any sites. <br /> <br />IV. Study Schedule: <br /> <br />Initial Year - FY 1995 <br />Final Year - Unknown <br /> <br />V. Relationship to RIPRAP: <br />GENERAL RECOVERY PROGRAM SUPPORT ACTION PLAN <br />II. Restore habitat <br />II.A. Restore flooded bottomland habitats <br />II.A.2. Screen high-priority sites for potentia] restoration/acquisition <br />GREEN RIVER ACTION PLAN: MAIN STEM <br />II. Restore habitat <br />II.A. Restore and manage flooded bottomland habitat <br />11.A.] Implement levee removal strategy at high-priority sites <br />II.A.].a. Pre-construction <br />II.A.3.b. Construction <br />II.A.3.c. Evaluation <br />COLORADO RIVER ACTION PLAN: MAIN STEM <br />II. Restore habitat <br />rr.A. Restore and manage flooded bottomland habitat <br />II.A.4. Implement levee removal strategy at high-priority sites <br />II.A.4.a. Pre-construction <br />II. A. 4. b. Construction <br />II.A.4.d. Evaluation <br />COLORADO RIVER ACTION PLAN: GUNNISON RIVER <br />II. Restore habitat <br />II.A. Restore and manage flooded bottomland habitat <br />II.A.2 Implement levee removal strategy at high-priority sites <br />II.A.2.a. Pre-construction <br />II.A.2.b. Construction <br />rr.A.2.d. Evaluation <br /> <br />VI. Accomplishment of FY 2002 Tasks and Deliverables, Discussion of Initial Findings and <br />Shortcomings: <br /> <br />Task I. Pre-acquisition floodability assessments: <br /> <br />Task la. Reconnaissance surveys: A site reconnaissance survey was performed at the <br />Colorado Department of Transportation (CDOT) site. The CDOT site is a new site and is <br />C-6 hyd page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.