My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01948
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01948
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:33:31 PM
Creation date
10/11/2006 10:46:03 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8240.200.10.B
Description
UCRBRIP Annual Report
Basin
Colorado Mainstem
Date
4/9/2003
Author
UCRBRIP
Title
2002 Annual Reports Package Part 2
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />COLORADO RIVER RECOVERY PROGRAM <br />FY 2002 ANNUAL PROJECT REPORT <br /> <br />RECOVERY PROGRAM <br />PROJECT NUMBER: C-6 HYD <br /> <br />I. Project Title: <br /> <br />Hydrographic data collection - FY 2002 site surveys, floodability assessments, design <br />and engineering for habitat restoration along the Green River in Utah, the Colorado River <br />in Colorado, and the Gunnison River in Colorado. <br /> <br />11. Principal Investigator(s): <br /> <br />Peggy M. Bailey, P.E. <br />Tetra Tech, Inc. <br />410 South French Street <br />Breckenridge, CO 80424 <br />(970) 453-6394 <br />(970) 453-4579 FAX <br />peggy .bai ley@ttisg.com <br /> <br />III. Project Summary: <br /> <br />The objectives of this work are: <br /> <br />I. To determine bankfull flood flows, with and without excavation; <br /> <br />2. To determine area of inundation as a function of flow, with and without <br />excavation; <br /> <br />3. To compare historical versus existing frequency, duration, and timing of flood <br />flows, with and without excavation; <br /> <br />4. To characterize pre-restoration baseline channel and site morphology, and post- <br />restoration morphology; and <br /> <br />5. To develop design options for enhancing floodability and to assist with <br />construction oversight. <br /> <br />A site owned by the Colorado Department of Transportation was surveyed in FY 2002. <br />The reconnaissance survey, data collection and preparatory work for hydrologic analyses were <br />completed. Topographic mapping and floodabijity analyses were initiated, and continue to be <br />developed in FY 2003. <br /> <br />Hydrographic surveys and floodability analyses were performed at Thunder Ranch, <br />formerly known as Escalante Ranch. Topographic data collected in FY 2002 were utilized to <br />update the site plan. <br /> <br />C-6 hyd page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.