My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01912
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01912
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:33:22 PM
Creation date
10/11/2006 10:44:29 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.129.D
Description
Upper Gunnison Project
State
CO
Basin
Gunnison
Water Division
4
Date
3/1/1964
Author
USDOI - BOR
Title
Reconnaissance Report - Upper Gunnison Project-Colorado - March 1964
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-=:r <br />In <br />In <br />....-1 <br /> <br />CHAPTER VI <br /> <br />SMALL DEVELOPMENT <br /> <br />Estimated Costs <br /> <br />Construction costs of project facilities are estimated at $7,079,500 <br />on the basis of January 19~3 prices and reconnaissance designs, In addi- <br />tion to ~hese costs the project would have a repayment obligation for <br />costs of necessary replacement storage in the Curecanti unit as shown in <br />the discussions of financial analyses on page 47, <br /> <br />Cement Creek Dam and Reservoir <br />Elko Dam and Reservoir1f <br />East Ri ver Canal <br />Gunnison Highline Canal <br />Crookton Canal <br />Laterals <br />Drains <br />Recreational facilties <br />Total <br />1/ Includes cost <br />of U, S, Highway 50 and <br />basin, <br />2/ <br />unito- <br /> <br />$1,250,000 <br />3,674,000 <br />298,000 <br />540,000 <br />630,000 <br />112,400 <br />149,800 <br />425.300 <br />Y7.079,500 <br />of relocating approximately 5,5 miles <br />other facilities in the reservoir <br /> <br />Excludes costs for replacement storage in Curecanti <br /> <br />Annual operation, maintenance, and replacement costs of project fa- <br />cilities under the limited development are estimated at $65,040 on the <br />basis of 1960-62 prices, These costs are exclusive of costs for use of <br />replacement storage in the Curecanti unit, <br /> <br />Irrip;ation <br /> <br />Areas served <br /> <br />Acreages that would be furnished irrigation water under the small <br />development are itemized below. <br /> <br /> Project irrigable area <br /> (Unit--acres) <br /> East Ohio Tomichi <br /> River Creek Creek <br /> area area area Total <br />Full service land 3,130 670 3,690 7.490 <br />Supplemental service land 8 000 60 1 60 <br />Total 0 13 0 2 0 <br /> <br />44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.