Laserfiche WebLink
<br />Lo'") <br />M <br />If') <br />_i <br /> <br />CHAPTER IV <br /> <br />COMPREHENSIVE DEVELOPMENT <br /> <br />Number of generating units <br />Installed capacity (kilowatts) <br />Salable capacity (kilowatts)!! <br />Average annual energy <br />generation (1,000 kilowatt-hours) <br />Average annual salable <br />energy (1,000 kilowatt-hours)~! <br />Rated head <br />Hydraulic capacity (second-feet) <br />!! About 10 percent less than <br />mission losses. <br />~! About 7 percent less than average annual generation because of <br />transmission losses. <br /> <br />Taylor <br />Park Almont <br />Powerplant Powerplant Total <br />1 1 2 <br />8,500 13,700 22,200 <br />7,650 12,330 19,980 <br />24,212 52,024 76,236 <br />22,517 48,383 70,900 <br />157 405 562 <br />800 500 <br />installed capacity because of trans- <br /> <br /> <br />Taylor Park Darn, spillway, and outlet works. Powerplant <br />site in center foreground would be excavated and <br />penstocks extended to increase the power head. <br /> <br />25 <br />