My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01909
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01909
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:33:22 PM
Creation date
10/11/2006 10:44:20 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.500
Description
Colorado River Basin Salinity Control - Federal Agencies - EPA
Basin
Colorado Mainstem
Water Division
5
Date
3/12/1979
Title
State - EPA Agreement -- Colorado Region VIII FY 79
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />I- <br />c:Jl <br />~ B. Environmental Protection Agency agrees to use its best <br />~ efforts to implement the program presented in Attachment <br />B at the level of resources identified in Table 1 of Attach- <br />ment B in support of the State's program. Significant <br />activities and commitments are: <br /> <br />1. Completion of EPA's evaluation of the State's NPDES <br />permit program. <br /> <br />2. Assume responsibility for case preparation and <br />litigation on an as needed basis. <br /> <br />3. Conduct compliance monitoring on 53 NPDES permit <br />holders and evaluate the discharge from 22 munici- <br />pal wastewater treatment facilities for toxics. <br /> <br />4. Review and/or approve nine 208 plans which are anti- <br />cipated to be certified to EPA during FY 1979. <br /> <br />5. Provide the State 106, 208, 205(g) and 314(etc) <br />grant funding consistent with those levels identi- <br />fied in Table f of Attachment A. <br /> <br />6. Delegate to the State responsibility for parts of <br />the construction grants program per the schedule in <br />the future 205(g) delegation agreement between the <br />State and EPA. <br /> <br />7. Reduce the processing time of construction grants. <br /> <br />8. Make FY 80 Solid Waste Program Crant offer no <br />later than September 30, 1979, provided a final <br />grant appli.cation is received no later than August <br />15, 1979. <br /> <br />9. Expand the scope of the SEA to include guidance on <br />the specific commitments included for Air Quality <br />in Attachment B. <br /> <br />10. Make FY 80 air program grant (105) offer no later <br />than September 30, 1979, provided a final grant appli- <br />cation is received no later than August 15, 1979. <br /> <br />11. Commit to provide all guidance according to the time- <br />table listed in Appendix C and all technical assis- <br />tance as specified in Attachment B. <br /> <br />12. Assist in New Source Reviews (NSR) as speci.fied in <br />Attachment B. <br /> <br />13. Coordinate and provide assistance with 175 grants in <br />accordance with Attachment B. <br /> <br />-3- <br /> <br />i~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.