Laserfiche WebLink
<br />I-" <br />CJ1 <br />o <br />l'0 <br /> <br />TABLES <br /> <br />Table 1. Estimated 1975 populations in study units and increments of <br /> <br />population growth associated with projected levels of <br /> <br />energy-resource development in 1975 and 2000----------------- <br /> <br />2. Existing and projected additional powerplant capacities <br /> <br />through the year 2000 for impacted subareas in the <br /> <br />Upper Colorado River Basin----------------------------------- <br /> <br />). Projected coal utilization in the Upper Colorado River Basin <br /> <br />in the year 2000--------------------------------------------- <br /> <br />4. Present sediment load at gaging stations in the White River <br /> <br />study reach and projected increments of sediment loading <br /> <br />associated with medium energy-resource development without <br /> <br />EET in the year 2000----------------------------------------- <br /> <br />5. Present sediment load at gaging stations in the Colorado River <br /> <br />study reach and projected increments of sediment loading <br /> <br />associated with medium energy-resource development without <br /> <br />EET in the year 2000----------------------------------------- <br /> <br />6. Present sediment load at gaging stations in the San Juan River <br /> <br />study reach and projected increments of sediment loading <br /> <br />associated with medium energy-resource development without <br /> <br />EET in the year 2000----------------------------------------- <br /> <br />7. Present sediment load at gaging stations in the Green River in <br /> <br />Utah studY reach and projected increments of sediment <br /> <br />loading associated with medium energy-resource development <br /> <br />without EET in the year 2000--------------------------------- <br /> <br />. <br /> <br />Page <br /> <br />:l. <br /> <br />1 <br /> <br />.s <br /> <br />/0 <br /> <br />/7 <br /> <br />Iy <br /> <br />.:; <br /> <br />/9 <br />