Laserfiche WebLink
<br /> <br /> <br />part-- I <br /> <br />Summary <br /> <br />~ <br />h <br />ii <br /> <br />STATISTICAL DATA <br /> <br />/ <br /> <br />Statistical data for the proposal are as follows: <br /> <br />COSTS (prices as of July 1970) <br /> <br />Feature <br /> <br />Costs <br /> <br />Two Forks Dam and Reservoir <br />Turkshead Dam and Reservoir <br />Two Forks hydroelectric power <br />facilities <br />Recreation faoilities <br />Fish and wildlife enhancement <br />Permanent operating facilities <br />Total project costs <br /> <br />$128,273,000 <br />11,890,000 <br />, <br /> <br />26,924,000 1 <br />29,829,000.!!:. <br />589,000 <br />220,000 <br />$197, 725,000&! <br /> <br />!!:.I Includes $96,000 for replacement and relocation of existing recreation <br />facilities. This item was considered as a project cost instead of a <br />recreation cost in the economic analysis. <br />121 Does not include preauthorization cost of $795,000; as of July 1970. <br /> <br />BENEFITS AND COSTS (Annual, 100-year analysis) <br /> <br />Benefits <br /> <br />Item <br /> <br />Direct <br /> <br />M&I water <br />Power <br />Recreation enhancement* <br />Fish-wildlife conservation* <br />Flood control* <br />Total <br /> <br />$ 5,401,000 <br />2,787,000 <br />9,490,000 <br />503,500 <br />1,488,000 <br />$19,669,500 <br /> <br />* Benefits estimated by cooperating agencies <br />1.4 <br />