Laserfiche WebLink
<br />"' ~ <br />:.\) <br />...~ <br /> <br />reduction in costs will offset the minor increase in water <br /> <br />distribution costs as the irrigated area is increased about <br /> <br />221.. <br /> <br />Annual costs would then be as follows: <br /> <br />Operation and maintenance <br />Total <br />Per acre irrigated <br /> <br />Repayment of Construction <br />Total <br />Per acre irrigated <br /> <br />Total irrigation costs <br />Total <br />Per acre irrigated <br /> <br />Present <br />3600 Acres <br />Irrigated <br /> <br />$ 10,200 <br />2.83 <br /> <br />o <br />o <br /> <br />10,200 <br />2.83 <br /> <br />* If total construction cost is repaid in 40 years. <br /> <br />45 <br /> <br />With Project <br />4400 Acres <br />Irrigated <br /> <br />$ 8,700 <br />1.98 <br /> <br />11,500* <br />2.61 <br /> <br />20,200 <br />4.59 <br />