Laserfiche WebLink
<br />o <br />C') <br />,.., <br /> <br />Sumrr~ry of Construction Cost <br /> <br />Examination and surveys <br /> <br />Harvey Gap Reservoir <br /> <br />Grass Valley Canal <br />Total <br /> <br />~ 15,000 <br />402,000# <br />41,000 <br />$458,000 <br /> <br /># Includes $5,000 for coal rights. <br /> <br />Annual Costs <br /> <br />Assessments during 1928-1939 have averaged ~2.40 per share <br /> <br />annually and outstanding indebtedness increased ~3,500 or ~0.07 <br /> <br />per share during the period, making a total annual operation cost <br /> <br />of $10,200 on the 4,126 shares outstanding. An average of 3,600 <br /> <br />acres are irrigated. <br /> <br />The 4,400 acre project area would receive an average 85~ <br /> <br />supply in 1930-1939. In periods of better run-off the full <br /> <br />4,400 acres would be fully irrigated every year. <br /> <br />With the Grass Valley Canal reconstructed as contemplated, <br /> <br />maintenance costs for this canal will be reduced fUlly $1,500 <br /> <br />per year. Reservoir operation costs may be reduced somewhat <br /> <br />through reconstruction of the outlet works, and such minor <br /> <br />44 <br />