Laserfiche WebLink
<br />cc <br />. , <br /> <br />.." <br /> <br />J <br /> <br />steel pipe would be used also, but it would be laid so as to <br /> <br />act as an inverted siphon. It would be on temporary adjustable <br /> <br />supports where the ground is moving. <br /> <br />It is proposed to provide surface ditches at all three slide <br /> <br />areas to intercept surface water and prevent its entering the <br /> <br />moving ground. <br /> <br />In addition to repairing the canal at the slides it is pro- <br /> <br />posed to line a few short sections with clay to reduce seepage. <br /> <br />The work outlined above is estirr~ted to cost $41,000. It <br /> <br />should greatly improve service and rr~terially reduce maintenance <br /> <br />cost of the ditch which has averaged approxirrately ~d,500 <br /> <br />annually for the past 4 years, exclusive of the ditch tender's <br /> <br />salary. <br /> <br />42 <br />