Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />PaQe <br /> <br />eomments <br /> <br />D-9 Figure D-2. Is generation capability per unit (112,500 kW) correct? <br /> <br />D-I0 1st sentence. Change "practical" to "practicable", to be consistent <br />with the eRSP Act. <br /> <br />0-10 5th sentence. Delete "not available", replace wi "not guaranteed to be <br />available" . <br /> <br />Last sentence. Change the words "nameplate energy" to "nameplate <br />capacity". Change the word "overall" to "maximum". Delete the phrase, <br />". . . or limits, . . .11. <br /> <br />0-11 Correct Table D-2. Heading should read "Nameplate Capacity (kW)", <br />rather than "Energy (kW)". Insert the word "Maximum" above the column <br />heading "eapacity (kW)". <br /> <br />D-12 2nd para., 1st sentence. Insert the parenthetic phrase "(Colorado <br />River Basin Project Act)" after the reference to P.L. 90-537. <br /> <br />2nd para., last sentence. Delete the words "Operating Criteria" and <br />replace with "eriteria for Coordinated Long-Range Operation of eolorado <br />River Reservoirs". <br /> <br />3rd para. The word "act" should be capitalized in several places in <br />this paragraph. <br /> <br />4th para., 1st sentence, 6th line. <br />regulation, beneficial consumption <br />the words "flood control". <br /> <br />Insert the words, "river <br />uses, power production" following <br /> <br />0-13 2nd para., last sentence. Definition of active storage as noted is <br />inconsistent with Figure D-2 on page D-9. <br /> <br />D-14 Text re: Phase I. Elaborate on unpredictabi1ity of pre-dam flows and <br />high susceptibility to flash flooding. Text should stress range of <br />variation--erratic. <br /> <br />D-15 It is unclear whether these graphs are based upon monthly, daily or <br />hourly flows. <br /> <br />D-16 Table D-3. Are the delineations under the column heading "Operating <br />Regimes", reversed? <br /> <br />0-17 Phase III. 2nd paragraph. 6th sentence. Del >31,500 should be rare <br />if USBR is able to adopt pre-rel. program. <br /> <br />4th para., 1st sentence. ehange "These" to "The". <br /> <br />D-1B 4th paragraph. Determination of Monthly Release Volumes. 2nd <br />sentence. Insert the words "power and", before the word "energy". <br /> <br />ID <br />