Laserfiche WebLink
<br /> <br />2,050,000 <br />9,290,000 <br />570,000 <br />280,000 <br />265,000 <br />1,280,000 <br />1,415,000 <br />510,&Q9. <br />17,545,000 <br />assignable <br /> <br /> <br />....... ,~ ."'\ (\ <br />I. "1 " ',I <br /> <br />BASALT PROJECT <br /> <br />PROJEC'f PI.JIN, FEATURES, AND COSTS <br /> <br />- <br /> <br />by project features includes contingencies, engineering, and general <br />expenses. <br /> <br />Feature <br />Ruedi Reservoir <br />Missouri Heights Reservoir <br />enlargement <br />Bp.salt Conduit <br />Landis Canal <br />Carbondale Canal <br />Sopris Canal <br />Spring Valley lateral <br />Farm laterals <br />Drains <br />Tot al <br />1/ Portion of reimbursable cost <br />to Basalt project. <br /> <br />Estimated <br />construction cost <br />17$1,885,00'0 <br /> <br />Operation, maintenance, and replacement costs <br /> <br />Operation, maintenance, and replacement costs are estimated at <br />$49,000 annually, based on average wages and prices from 1959 through <br />~ 1961. Included in this amount is $2,100 assigned to the Basalt project <br />for operation and maintenance of the Fundi, Dam and Reservoir. The esti- <br />mate includes the cost of personnel, equipment. materials. supplies. and <br />administrative services. It does not include operation and maintenance <br />costs of existing irrigation facilities. <br /> <br />'-- <br /> <br />17 <br />