My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP01689
CWCB
>
Water Supply Protection
>
Backfile
>
1001-2000
>
WSP01689
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 12:32:16 PM
Creation date
10/11/2006 10:36:52 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8141.400
Description
Fryingpan-Arkansas Project - Reports
State
CO
Basin
Arkansas
Water Division
5
Date
12/1/1962
Author
US DoI BoR
Title
Ruedi-Western Slope Investigations Colorado
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
123
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />INTRODUCTION <br /> <br /> <br />..... ~ ...' ,,~ <br />~'.ti.il..) <br /> <br />. <br /> <br />The accompanying reports present an appraisal in reconnaissance <br />scope of the Basalt and Bluestone projects in the Colorado River Basin <br />of Colorado. commonly referred to as Colorado's western slope. These <br />two projects would utilize water of the Ruedi Reservoir which has 'been <br />authorized to be constructed on the Fryi.ngpan River. a tributary of the <br />Roaring Fork River which in turn enters the Coloraclo River near Glenwood <br />Springs. Colo. The Ruedi Dam will be an earthfill structure rising 270 <br />feet above stre=bed. It will create a reservoir of about 100.000-acre- <br />foot capacity. covering an area of 1.000 acres. <br /> <br />The Ruedi Reservoir is a feature of the Fryingpan-Arkansas project. <br />authorized by the Act of July 16, 1962 (Public Law 87-590). The primary <br />purpose of that project is to divert water eastward through the Continen- <br />tal Divide from the Colorado River Basin for multiple-purpose use in the <br />Arkansas River Basin in Colorado. The Ruedi Reservoir is included in the <br />project to provide replacement storage for existing water uses on the <br />western slope and to provide additional storage to serve future water <br />resource developments in that area. <br /> <br />. <br /> <br />The authorizing act for the Fryingpan-Arkansas project also provides <br />that the Secretary of the Interior shall investigate and prepare a report <br />on the feasibility of a replacement reservoir with a capacity of approxi- <br />mately 5.000 acre-feet at or near the Ashcroft site on Castle Creek. a <br />tributary of the Roaring Fork River above its confluence with Fryingpan <br />River. but construction of the reservoir shall not be cowY~nced unless <br />the report. which shall be submitted to the President and the Congress, <br />demonstrates the feasibility of the reservoir and is approved by the <br />Congress. The Secretary of the Interior is directed by the same act to <br />expedite completion of his planning report on the Basalt project as a <br />potential participating project under the Colorado River Storage project. <br /> <br />. <br /> <br />Under the terms of the authorizing legislation the Fryingpan-Arkansas <br />project will be operated in a manner which has been agreed upon by the <br />State of ColoradO and by both eastern and western slope representatives as <br />evidenced by the detailed "operating principles" which are made a part of <br />the leGislation by reference. These "operating principles", a copy of <br />which is bound near the back of this VOlume, can be changed only by unani- <br />mous consent of the signatory parties or by an amendment to the authoriz- <br />ing act for the lcryingpan-Arkansas project. The principles require that <br />the Ruedi D= and Reservoir be completed and in operation before any water <br />is diverted to the Arkansas Basin. The tentative constru.ction program <br />provides a 6-year period for construction of the dam and reservoir. The <br />first year will be devoted mainly to preconstruction activities, the next <br />four years to active construction, and the sixth year to minor completion <br />work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.